1) longitudinal RCC cofferdam
碾压混凝土纵向围堰
2) longitudinal roller compacted concrete cofferdam
纵向碾压凝土围堰
3) RCC cofferdam
碾压混凝土围堰
1.
The application of digital detonators energy control system on demolition blasting of TGP′s Ⅲ-phase upstream RCC cofferdam was introduced in this present paper.
本文介绍了i-konTM数码雷管起爆系统在三峡三期碾压混凝土围堰拆除爆破中的应用情况。
2.
The scale,total charge,technique and operated difficulty of the demolition of the third-stage upstream RCC cofferdam all exceed those of the implemented cofferdam demolition at home and abroad.
三峡工程三期上游碾压混凝土围堰拆除的规模、总装药量及技术与施工难度均超过国内外已实施的围堰拆除,因爆破紧邻主体建筑物,为确保建筑物的安全,通过理论分析与模型试验,选取了以“倾倒为主,炸碎为辅”的拆除方案,由于爆破水深,为确保倾倒缺口的形成,由我国国内企业自主研制并使用了高威力、高抗水型的混装炸药,同时为防止爆破振动叠加,首次从国外引进了数码雷管实施控制爆破。
3.
After the removal of crest portion of the downstream RCC cofferdam of the Goupitan hydroelectric project,it will serve as a "silver wrapped in gold " permanent submerged dyke.
构皮滩水电站下游碾压混凝土围堰顶部部分拆除后形成“金包银”结构的二道坝,工程结构复杂,质量要求高。
4) longitudinal concrete cofferdam
纵向混凝土围堰
5) concrete longitudinal cofferdam
混凝土纵向围堰
1.
A study on stochastic model for the construction of concrete longitudinal cofferdam in the Three Gorges Project;
三峡工程混凝土纵向围堰施工的随机模型研究