说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 鱼雷验收
1)  torpedo acceptance
鱼雷验收
1.
The necessity and urgency of improvement in inspection of current torpedo are discussed through analysis of advantage and disadvantage of the current item-by-item inspection for torpedo acceptance.
分析了采用逐条验收方法进行鱼雷验收的利与弊,提出了改进现行鱼雷验收方法的必要性和紧迫性,以及采用抽样检验的鱼雷必须满足的几个条件。
2)  torpedo receiver
鱼雷接收机
1.
Traditional methods used for measuring torpedo receiver weak-signal are to connect the weak-signal to the instrument with the wire,then the acquisition board collects signal,and the root means square(RMS) of signal is computed with the formula.
传统的鱼雷接收机弱信号测量方法是将弱信号通过导线引入测量仪器,直接利用采集板采集信号,再通过有效值计算公式计算得来,这种方法由于测量导线过长和放大器底噪声等带来的干扰问题,导致测量误差过大、测量精度不高。
3)  torpedo experimental establishment
鱼雷试验站
4)  torpedo recovering search boat
鱼雷回收搜索艇
5)  lightning installation inspection
防雷检测验收
6)  torpedo [英][tɔ:'pi:dəʊ]  [美][tɔr'pido]
鱼雷
1.
Research on torpedo anti-ship active fuze based on phase-coded signal;
基于相位编码信号的鱼雷主动反舰声引信研究
2.
The Application of Li/SF_6 Heat Source in the Torpedo and the UUV Propulsion Systems;
Li/SF_6热源在鱼雷和UUV推进系统中的应用
3.
The research on modeling and simulation of torpedo reverberation;
鱼雷混响建模与仿真研究
补充资料:承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利
承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利:根据我国《合同法》的第278条规定隐蔽工程在隐蔽以前,承包人应当通知发包人检查。发包人没有及时检查的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。根据《合同法》第279条中的规定建设工程竣工后,发包人应当根据施工图纸及说明书、国家颁发的施工验收规范和质量检验标准及时进行验收,因此在工程完成时组织竣工验收,也是发包人的主要义务。建设工程竣工验收合格后,方可交付使用,未经验收或者验收不合格的,不得交付使用,发包人对未经验收的工程,提前使用或者擅自动用的,对发现的质量问题由发包人自行承担责任。-------------《民法》第一版,第514页。魏振瀛;《合同法》的第278条
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条