1) sample maximum probability failure number
样本最大概率失败数
2) failure probability
失败概率
1.
In the end,according to the fuzzy evaluation matrix and the weighting coefficient of each factor,the failure probability and the failure consequence for the development risk are evaluated by the fuzzy-based assessment method,and the development risk value is obtained from the failure probability and the failure consequence.
首先,对风险评价的一般方法进行分析;然后,确定了军用飞机研制的风险源因素和风险后果因素,采用模糊集表示风险源因素对研制失败的影响和风险后果因素的大小,并对各个因素进行模糊评价;最后,根据各个因素的模糊评价矩阵及其权重,采用模糊综合评价方法获得研制风险的失败概率和失败后果,由失败概率和失败后果可得到研制风险的大小。
3) Maximum sample size
最大样本数
4) probability sample
概率样本
5) sample probability
样本概率
6) Link failure probability
链路失败概率
补充资料:平均样本量(见平均抽样数)
平均样本量(见平均抽样数)
average sample size: see average sampling number; ASN
Pingiun Yangbenliang平均样本t(ave班罗留盯甲le size)样数。见平均抽
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条