1) conventional 35 kV substation
常规35kV变电站
3) conventional substation
常规变电站
1.
Research on pattern of conventional substation transformed into digitized substation
常规变电站数字化改造的模式研究
2.
In period of integrated substation automation having developped rather ripely, the problems are worth of research that how to transform a conventional substation into an unattended one for the purpose of reducing investment and personal burden, increasing benifit on decreasing persons and utilizing the existing facilities reasonably.
常规变电站实现无人值班 ,减少投资 ,减轻人员负担 ,减人增效 ,合理利用现有设备 ,是值得研究的问题。
4) 35kV electric furnace transformer
35kV电炉变
1.
The thinks and methods for reactive power compensation of 35kV electric furnace transformer in Yinnan electric grid;
银南电网35kV电炉变无功补偿的思路和方法
5) 35kV substation
35kV变电所
1.
The research accomplishments and the application condition of " The pilot project of construction mode optimization for 35kV substation in rural power network " were mainly introduced.
文章主要介绍了“农村电网35kV变电所建设模式优化试点工程”的研究成果和应用情况,提出“35kV变电所单线单变、10kV线路环网”的供电新模式,该模式提出35kV变电所采用一路高压进线,所内简化设计,单线单变,T接于线路上,合理确定多个电源点的思想,并通过10kV线路环网模式,提高10kV线路供电可靠性,降低电网损耗,解决了传统供电模式在变电所的占用地面积、资金的投入、设备的日常维护、对用户的供电可靠性等方面存在的问题。
6) conventional power station
常规电站
1.
This paper put forward a series of optimization scheme and sums up the calculation experience of tail water system transition process of the conventional power station,and provides reference for similar projects,based on the computation and analysis of Lechang Gorge Hydropower Station.
本文通过对乐昌峡水电站进行过渡过程计算与分析,提出了一系列优化方案,总结了常规电站尾水系统过渡过程的计算经验,为同类工程提供借鉴。
补充资料:变电站
改变电压的场所。为了把发电厂发出来的电能输送到较远的地方,必须把电压升高,变为高压电,到用户附近再按需要把电压降低。这种升降电压的工作靠变电站来完成。变电站的主要设备是开关和变压器。按规模大小不同,称为变电所、配电室等。