4) Install the tail lamp.
安装尾灯。
5) increased safety luminaire
增安型灯具
6) anchorage installation
锚具安装
1.
The following paper illustrates pre-stressed tensioning technique from stretching apparatus,tensioning control,tensioning operation,stretching order,tensioning procedure,anchorage installation and safety problem,and discusses the control of pre-stress loss in the stage of tension,in order to ensure the construction quality of pre-stressed concrete beam slab.
从张拉设备、张拉控制、张拉操作、张拉顺序、张拉程序、锚具安装及其安全问题等方面对预应力张拉技术进行了详细阐述,并对张拉阶段预应力的损失控制进行了论述,以保证预应力混凝土梁(板)的施工质量。