1)  tunnel vertical well
隧道竖井
1.
This paper analyzes the construction method of Zhulingtou tunnel vertical well and structure,which could be a successful practice for similary engineering.
以朱岭头隧道竖井施工为例,介绍了其施工方法及其结构的施工控制。
2)  shaft I in Cangling Tunnel
苍岭隧道1号竖井
1.
This paper introduces construction technology of shaft I in Cangling Tunnel such as plan design, construction practice, shaft excavation, upgrading equipment selection and secondary lining as well as corresponding safety measures.
文章介绍了苍岭隧道1号竖井施工技术方案的设计与施工实践、竖井开挖、提升设备的选型、二次衬砌的施工工艺以及相关的安全措施。
3)  silo coal tub way
竖井罐道
1.
The main specs,structures and existing problems of wire rope for silo coal tub way,device for workers built on stilts in inclined well,balance,brake for drop-proof apparatus in assistant work of coal production are introduced in detail.
详细介绍煤炭生产中辅助作业用竖井罐道钢丝绳、斜井架空乘人装置用钢丝绳、平衡钢丝绳、防坠器制动钢丝绳的主要规格结构及使用中存在的问题,结合《煤矿安全规定》提出科学选择和使用该类钢丝绳的建议。
4)  conduit silo
管道竖井
5)  shaft (or well) tomb passage
竖井墓道
6)  access shaft
竖井通道
补充资料:弹塑性岩体内竖井地压理论


弹塑性岩体内竖井地压理论
ground pressure around shaft in elastic-plastic rock

tonsux一ng yant一ne一shuJ一ngd一yol一}un弹塑性岩体内竖井地压理论(ground pres-sure around shaft in elastie一plastie roek)在表土或软岩中掘进竖井时,若岩体只产生弹性变形,岩体是稳定的,不必计算地压。只有在产生塑性及流变变形时,才需要计算地压;竖井各水平截面上地压不等。按轴对称条件求出竖井周边位移,再求出支护位移公式,将它们联立求解,即可得到竖井地压。也可用图解法找到两条位移与应力关系曲线的交点,该点的纵坐标值即为竖井地压(见图)竖井围岩周边位移公式为: “止 U 竖井变形地压计算图 1围岩位移曲线;z支护特性曲线 a(p。s、n,,+。eos叭)厂(尸。+。.eot,t川一sin,.门导 ZG,匕P。+cicot笋,J式中“。为竖井围岩周边位移,m;a为竖井掘进半径,m;P0为原岩水平应力,重力场条件下,P0一六yI1,MPa;c,为第i层岩石粘结力,MPa;尸b为支护抗力,等于围岩作用在支护结构上的径向压力,但作用方向相反,MPa;笋,为第i层岩石内摩擦角;G.为第!层岩石剪切弹性模量;MPa。 竖井筒形支护特性方程为: l一群2厂bZ+a,尸1。, z,‘一二六舟}头‘-共一一IP,b EL右2一aZx一尸J“”式中u。为支护外半径表面的径向位移,支护与围岩密贴的情况下,“,一“、;E及产分别为支护材料的弹性模量及泊桑比;“为支护内半径,m;b为支护外半径,m;尸二为竖井变形地压,尸。一尸b,MPa。 (高磊)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。