2) power engineering project
电力工程项目
1.
The preparation work is an essential and necessary phase power engineering project,which greatly affects the project s sustainable development,investment control and investment result.
前期工作对电力工程项目是一个十分重要且必要的阶段,对项目的持续发展、投资控制、投资效果的影响都十分重大,前期工作扎实与否将影响到项目能否得到国家发改委的核准。
3) hydropower project
水电工程项目
1.
Preliminary study on risk management of hydropower project;
水电工程项目风险管理初探
2.
Risk factors coming from the technology, the economy, the nature and the social and other aspects, are interdependence and interaction during the development and construction of hydropower projects, so they are very difficult to quantify.
水电工程项目在开发建设过程中往往面临着来自技术、经济、自然和社会环境等诸多方面的风险和干扰,其风险因素又难以量化且他们之间相互关联,相互影响。
5) power grid project
电网工程项目
1.
Based on the Wuli-Shili-Renli(WSR) system methodology,the risk analysis of the power grid project fi-nancial lease is divided into three stages: Wuli,Shili and Renli.
基于物理-事理-人理(WSR)系统方法论,将电网工程项目融资租赁风险分析分为物理、事理、人理三个阶段。
2.
Risks with different type and character will exert serious effect upon the construction and operation of power grid project.
电网工程项目具有投资规模大、技术难度高,工程线长、点多、面广等特点,因而在自然环境、技术、经济、管理、决策上有许多不确定性因素,面临着不同类型、不同性质的风险。
补充资料:电厂项目融资结构
电厂项目融资结构
【电厂项目触资结构】项目各参与方的风险图表示。