1) fault critical clearing time
故障临界清除时间
1.
The fault critical clearing time was determined by the crossing point of the quadratic surface with the continuous fault trajectory.
为提高多机系统故障临界切除时间的求解精度和保证确定的误差方向,该文在主导不稳定平衡点处利用空间二次曲面来近似局部稳定域边界,根据持续故障轨线与空间二次曲面的交点来确定系统的故障临界清除时间。
2) critical fault clearing time
故障临界切除时间
1.
Some analysis focusing on the transient stability at the sending end of AC/DC hybrid system taking critical fault clearing time(tcr) as the inductoris are made and an Optimal Variable Aim Control(OVAC) strategy is proposed to improve its transient stability.
采用故障临界切除时间为指标,对交直流混合系统的送端进行了暂态稳定性分析,并提出采用最优变目标的控制策略来提高其暂态稳定性。
3) clearing time
故障清除时间
4) Critical clearing time
临界清除时间
1.
Determination of critical clearing time for power system faults using distance sensitivity;
运用距离灵敏度确定电力系统故障临界清除时间
6) fault clearance time
故障消除时间
补充资料:极限故障切除时间
极限故障切除时间
critical fault clearing time
J一x一an gu之hongq}eehu sh{Jlan极限故伸切除时间time)(eritieal faulr见衡态德定计葬。elea八ng