1) contractor control
承包商控制
2) Main instrumentation and contrds contractor (MICC)
主仪表控制承包商(MICC)
3) pre-selection system of contractor
预选承包商制度
4) contracting cost control
总承包成本控制
5) contractors
[英][kən'træktə] [美]['kɑntræktɚ]
承包商
1.
Views on HSE management on contractors.;
浅谈对基建承包商的HSE管理
2.
How to deal with project amount listing price risks for the contractors;
承包商如何应对工程量清单计价风险
3.
The Risking Research of Contractors in Engineering Construction Bidding Stage;
工程施工招投标阶段承包商的风险研究
6) general contractor
总承包商
1.
Study on Division of Profit and Vertical Integration of General Contractor
工程总承包商的利益分配及纵向一体化研究
2.
Compared with traditional contract models,the general contractors undertake more risks in the implementation process of EPC projects.
与传统的承发包模式相比,总承包商在EPC项目的实施过程中承担着更多的风险因素,因此,项目管理者要有强烈的风险意识,学会控制和防范风险。
3.
This paper sets up the cost models of construction industry and general contractor under the two conditions of vertical integration and non-integration.
只具有设计能力的工程总承包商要实施工程总承包项目,对自己目前缺乏能力完成的施工工作必须决策是分包给施工企业还是培育自身的施工能力。
补充资料:保险商实验室安全标准(见保险商实验室)
保险商实验室安全标准(见保险商实验室)
safety standards of UL: see Underwriters Laboratories; UL
Baoxianshang Sh啊nshi anquan bicozhun保险商实验室安全标准(saJ七ty stand助dsofUL)见保险商实脸室。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条