1) water pumping debugging
抽水调试
1.
Hydraulics prototype observation in water pumping debugging period for TGP lock;
三峡永久船闸抽水调试期水力学原型观测
2) pumping test
抽水试验
1.
The reasons and measures of wells collapse for Myanmar ship yard pumping test;
缅甸船厂抽水试验井壁坍塌原因分析及处理措施
2.
Hydrogeological functions of a large pumping test;
大型抽水试验的水文地质意义
3.
Identification of well loss and its significance in pumping test
井损的消除方法及其在抽水试验中的作用
3) wells for pumping test
抽水试验井
1.
During the construction of one Myanmar ship yard dry dock project,a part of wall of wells for pumping test collapsed.
缅甸某干船坞工程在抽水试验井施工过程中发生井壁局部失稳事故,有地下水动力作用的自然因素,又有桩基础挤土效应、压密注浆等人为诱发因素。
2.
During the construction of the Myanmar ship yard 12000DWT dry dock project,a part of wall of wells for pumping test collapsed.
缅甸船厂12000DWT干船坞工程在抽水试验井施工过程中发生部分井壁坍塌,究其原因,有地下水动力作用的自然因素,又有桩基础挤土效应、压密注浆等人为诱发因素。
4) confined water pumping test
承压水抽水试验
1.
Analysis on confined water pumping test in a certain deep foundation pit construction in Shanghai;
上海某深基坑工程承压水抽水试验分析
5) snapshot debugging
抽点打印调试
6) water adjusting experiments
调水试验
1.
Effictiveness evaluation of the water adjusting experiments in the flood control engineering of Jiaxing city;
嘉兴市城市防洪工程调水试验效果评价
补充资料:巴斯康蒂抽水蓄能电站
| 巴斯康蒂抽水蓄能电站 Bath County Pumped Storage Power Station 位于美国弗吉尼亚州西北部,20世纪80年代是世界上装机容量最大的抽水蓄能电站。装机容量210万千瓦。厂房为半地下式,发电设计水头329米,抽水设计扬程335米,抽水最大流量 116米3/秒。上水库土石坝最大坝高140米 ,坝顶长731米。总库容4400万米3。下水库土石坝最大坝高41米,坝顶长690米,总库容3760万米 3。引水系统包括岸坡式取水口、引水平洞、竖井、压力隧洞、压力钢管和调压井等 。工程于1975年开工,1985年投产。
|
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条
