1) tension diagonal anchor bar
斜拉锚杆
2) inclined ground anchor
斜拉土层锚杆
3) raked anchor
斜锚杆
1.
Raked anchor construction of a diaghragm is taken as an example to deseribe the constructionprocess of raked anchor piles,which mainly include:design of raked anchor;selection of construction equipmentand design of drilling tools;construction process of grouting.
以某地下连续墙斜锚杆支护工程施工为例,介绍了斜锚杆桩的施工工艺,主要包括:斜锚杆的设计;施工设备的选择及机具设计;灌浆锚杆的施工工艺等。
4) drawing bolt
拉拔锚杆
5) Cross anchor
对拉锚杆
1.
This paper puts forward a kind of new construction technology–Cross anchor.
针对特大断面隧道采用双侧壁导坑法施工时预留核心土的稳定性问题,提出一种新的隧道施工工艺——对拉锚杆。
6) tensile anchorage bar
张拉锚杆
1.
The planning of parameters and selection of materials and facilities, and procedure of the productive test of tensile anchorage bar are described, meanwhile, the test result is analysed.
系统介绍了张拉锚杆生产性试验中参数拟定、材料及设备选择、试验步骤、工艺流程、成果分析,为张拉锚杆的施工质量、工程进度和施工安全提供了依据。
补充资料:采用可拆卸预应力锚杆技术进行高层建筑基坑护坡
采用可拆卸预应力锚杆技术进行高层建筑基坑护坡
霹 采用可拆卸预应力锚杆技术进行高层建筑基坑护坡
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条