1) erection of main beam
主梁安装
1.
This paper briefly introduces the technical process of the erection of main beam joints and main beam of 5t double-beam gallows crab bucket by usi ng 500×500 portal frame, sleepers and 50 t and 30 t autocranes, and expounds em phatically the overall design of the schemes, the selection of bearing platform s steel columns, the verification of the strength, and the erection of the platf orm, etc.
主要介绍了利用500×500龙门架,道木及50t、30t汽车吊进行5t双梁龙门抓斗主梁接头、主梁安装的工艺过程,并对其方案总体设计情况、支撑平台钢柱的选择、强度校验及平台搭设等环节进行了重点阐述。
2) pile equipment
箱梁安装
1.
Application of cross-mound Longmen support in pile equipment and construction;
跨墩龙门架在箱梁安装施工中的应用
3) Installation of beam slab
梁板安装
4) install crossbeam
大梁安装
5) steel girder erection
钢梁安装
6) slope beam mount
斜梁安装
补充资料:设备的安装——设置安装基准
设备的安装——设置安装基准 | ||
|
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条