2) Tailrace Tunnel
无压尾水洞
1.
Experimental Investigation of the Cooling Performance of Tailrace Tunnel Ventilation in Hydropower Stations;
水电站无压尾水洞引风换热试验研究
3) draw-off culvert
泄水涵洞
1.
Improvement of baffle measures downstream of the draw-off culvert of Moguhu Reservoir;
蘑菇湖水库泄水涵洞下游消能措施的改进
4) Sudden Water Inflow
泄水洞
1.
Drainage Drift of Western Section of Huanyingshan Tunnel and Its Effect on the Treatment of Sudden Water Inflow due to Rainstorm;
华蓥山隧道西段泄水洞工程及其对治理隧道暴雨涌突水的作用
5) no-pressure tunnel
无压隧洞输水
1.
This article deals with the discharge control design by measuring the flow at no-pressure tunnel project.
本文介绍了在大流量无压隧洞输水工程中,以流量测量为核心的输水控制设计。
6) tailrace tunnel ventilation
无压尾水洞引风
1.
Field test on heat and moisture transfer performance of tailrace tunnel ventilation in a hydropower station;
水电站无压尾水洞引风热湿交换特性的现场测试
2.
Thermodynamic calculation method of tailrace tunnel ventilation process in hydropower stations;
水电站无压尾水洞引风过程热工计算方法
3.
Theoretical study and application of heat and moisture transfer processes of tailrace tunnel ventilation in hydropower stations;
水电站无压尾水洞引风热湿交换过程的理论研究与应用
补充资料:冲击波超压与动压