1) full-face excavation tunnel
全断面开挖隧道
2) full section excavation
全断面开挖
1.
In this article,authors comprehensively analyze some aspects of the full section excavation method for rock tunnels such as every drill explosion methods,undermining modes,explosion parameters,and proper blast hole layout and so forth and give out practical construction data.
对隧道施工全断面开挖的各种钻爆方式、掏槽方式、爆破参数、合理布置炮眼等进行了综合分析,给出了实用的施工数据。
3) full-face excavation
全断面开挖
1.
Based on the research results of modeling test and numerical analysis of surrounding rock deformation behavior of the full-face excavation tunnel in karst regions,the regular time-space curve model of surrounding rock deformation was proposed.
运用相似模型试验和数值分析成果 ,分析岩溶区公路隧道在全断面开挖过程中的围岩变形特性 。
4) tunnel excavation
隧道开挖
1.
Analysis of the mechanical properties of the tunnel excavation and the tunnel support;
隧道开挖与支护的力学性能分析
2.
The settlement of tunnel excavation to architectural pile foundation and the internal force affection;
隧道开挖对建筑桩基的沉降及内力影响
3.
Monitoring and controlling technology for blasting vibration induced by tunnel excavation;
隧道开挖施工的爆破振动监测与控制技术
5) tunneling
[英]['tʌnəlɪŋ] [美]['tʌnəlɪŋ]
隧道开挖
1.
Displacement field in clay due to tunneling with force-controlled and displacement-controlled FEM;
基于受力控制和位移控制有限元法的隧道开挖对土体自由位移场的影响
2.
The problem of the seepage deformation caused by tunneling:a case of a tunnel in Nanjing area;
隧道开挖过程中的渗透变形问题分析——结合南京地区工程实例
3.
Empirical-Theoretical Prediction of Metro-Tunneling Induced Ground Settlement and Analysis of the Settlement-Resistant Characteristics of Irregularly Shaped Slab Member of Nearby Overpass Superstructure;
地铁隧道开挖引起地层沉降的经验理论法预测及邻近立交桥上部异形板构件抗沉降特征分析
补充资料:异形断面钢材(见异形断面型材)
异形断面钢材(见异形断面型材)
special section steel
,一、u以uu、’“飞豆on gQngC01异形断面钢材(speeial Seetion steel)见异形断面型材。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条