说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 升降模架
1)  raise formwork frame
升降模架
1.
On JFYM raise formwork frame which combines together climbing frame, climbing form, big formwork and gondola technologies in the structure and decoration construction, advanced technologies such as hydraulic lift and programable control are adopted to realize integral ascending and separate descending in precise synchro-control.
JFYM升降模架将爬架、爬模、大模板、吊篮等技术在结构施工与装饰施工中结合在一起,采用爬升箱液压升降和可编程控制等先进技术,实现连体上升和分体下降,做到高精度的同步控制;导向、防倾、防坠、同步及安全防护等设备配套,安全可靠,已被列为2003年建设部科技成果推广项目,在约180万m2的高层建筑施工中成功应用,效果良好。
2)  lifting platform
升降架
1.
With the precision degree of its lifting platform as a focal point, the paper also introduces the related mechanical models and the rigidity design of the lifting platform using conjugate beam method.
着重分析了升降架的设计精度要求,介绍了其力学模型及采用共轭梁法对升降架的刚度设计。
3)  elevator platform
升降机架
4)  up-climbing scaffold
升降脚手架
1.
It is known that electric up-climbing scaffold is widely used as protection and fitment service platform in the construction of high-rise and super-high-rise buildings at present time.
高层超高层建筑物施工目前大多采用电动升降脚手架作外围防护及装修操作平台。
5)  automatic erector
自动升降架
6)  tray elevator
盘架升降机
补充资料:PRO/E模架库安装方法
选择要安装的模架库,指明安装路径如D:\PTC,开始安装。
 安装完后进入D:\PTC\moldlib\bin\i486_nt(或95)下,运行mkmoldconfig.exe,
 敲上模架库路径D:\PTC,产生"config.pro"文件,这时就将这个文件里的内容
 合并到您的"config.pro"文件里就行了,模架库就可挂上了。
 再在您的"config.pro"文件里设置:search_path D:\PTC\moldlib\
 search_path_file D:\PTC\moldlib\bin\i486_nt\config.pro
 模架库就挂上了。
 在您的"config.pro"文件里设置:menu_translation both就可以中英文并存了。
 模架库启动方法:
 启动PROE,新建Assembly里的Design,产生asm0001.prt文件,再打开上边Applications
 下拉菜单
 中的mold layout,右边菜单选第二项Mold Base,再选ADD,选择合适模架就行了
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条