1) MW coal-fired unit
300MW燃煤机组
1.
This article analyzes different pipe material,Performance,price and service life for main pipe of 300MW coal-fired unit.
通过对300MW燃煤机组四大管道不同管材性能,价格及使用寿命的分析,在贵溪电厂二期扩建工程中,根据设计优化的原则选用了新型的管材。
4) 300 MW unit
300MW机组
1.
Steam extraction cogeneration retrofits for high temperature reheaters of domestically-made 300 MW units;
国产300MW机组高再抽汽供热改造
2.
Optimization retrofits of condensers for domestically-made 300 MW units;
早期国产300MW机组凝汽器优化改造研究
3.
Design analysis of automatic feed pump combining function for 300 MW units;
300MW机组给水泵自动并泵功能的设计分析
5) 300MW unit
300MW机组
1.
Through economical analyses of the operation of 300MW units in Xibaipo Power Plant,the potential problems of a part of the equipment and systems are revealed.
通过对西柏坡电厂300MW机组运行的经济分析,找出部分设备及系统存在的问鼎。
2.
One home-made 300MW unit, its air/coal/water control systems have poor control performance, and CCS can not run well, and the RB.
某国产300MW机组存在子控制系统控制品质差,协调控制系统方案不能投入正常运行,从未进行过RB试验。
补充资料:超临界燃煤发电机组
超临界燃煤发电机组:指容量为60万千瓦以上,主蒸汽压力达到25兆帕以上,温度达到593-650℃或者更高的参数,并具有一次再热或二次再热循环的燃煤发电装置,具有煤耗低、环保性能好、技术含量高的特点,机组热效率能够达到45%左右。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条