1) movements and deformations
移动与变形
1.
The predicting formulas of the tunnel movements and deformations are educed.
隧道沉陷主要包括6种表现形式的移动与变形。
2) ground surface deformation and movement
地表变形与移动
3) surface movement and deformation
地表移动与变形
1.
The deformation rules are understood by prediction of surface movement and deformation survey of surface and its nearby buildings to take precautions against d.
分析了地下矿山、露天矿山开采 ,铁路、公路、基坑、隧道和地下工程开挖引起的周围地表移动与变形的特点。
2.
The adaptability of random medium theory is discussed in estimating surface movement and deformation caused by excavation of urban tunnel and underground space.
探讨了随机介质理论在城市隧道及城市地下空间开挖引起的地表移动与变形预计中的适应性 ,得到了城市地下空间开挖的随机介质理论地表移动与变形模型 ,同时对城市地下工程开挖地表允许移动与变形值及其监测作相应分
3.
1 mine,under the mine geological conditions of instability coal ,the destruction process and the scope of overlying strata and surface movement and deformation caused by strip mining were revealed .
通过永华能源有限公司一矿雷坡村建筑物下条带开采工作面的现场观测分析,揭示了该矿地质采矿条件下不稳定煤层条带开采引起的上覆岩层的破坏过程、破坏范围和地表移动与变形规律。
4) ground surface movement and deformation
地表移动与变形
1.
By using stochastic medium theory, ground surface movement and deformation of tong youshan double-arch tunnel due to its excavation is calculated, the simplified calculate formulas are deduced, the calculated parameters of the whole tunnel are obtained by using scale method from the parameters of middle lead tunnel, and according these, the influenc.
应用随机介质理论,对桐油山连拱隧道开挖引起的地表移动与变形进行了分析,推导了简化计算的具体公式,根据中导洞开挖地表移动参数按比例法确定了整个连拱隧道的地表移动计算参数,据此分析预测了隧道开挖对地表建筑物的影响情况,计算结果对指导隧道的施工有一定的意义,也为其它同类结构的设计提供了参考。
2.
The ground surface settlement due to shallow tunnel excavation is considered as a stochastic process and the stochastic medium theory is applied to predict and analyze the ground surface movement and deformation in cross and longitudinal section due to tunnel construction.
将浅埋隧道开挖所引起的地表下沉视为一随机过程 ,应用随机介质理论 ,对隧道施工所引起的纵横向地表移动与变形进行了分析探讨。
5) stratum movement and deformation in longitudinal section
纵向地层移动与变形
6) Rock strata and surface movement
岩层与地表移动变形
补充资料:大坝内部变形观测(见水工建筑物变形观测)
大坝内部变形观测(见水工建筑物变形观测)
daba neibubianxing guanCe大坝内部变形观测见水工建筑物变形观测。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条