1) node-objected strategy
节点递归
1.
This paper presents an optimal recurrence method for storm water system with node-objected strategy based on graph theory and matrix theory.
提出节点递归算法优化雨水管网系统。
2) Nodal recurrence algorithm
节点递归算法
3) recurrent node
递归环节
4) end recursion method
端点递归法
1.
In the scheme implementation, the two - order end recursion method is utilized to do the search computing for adaptive codebook, and the run efficiency of algorithm is greatly raised.
在实现方法中 ,采用了二次端点递归法进行自适应码本快速搜索 ,很大程度上提高了软件效率 ,硬件方面考虑了DSP的外设资源 ,对其接口进行了合理设计。
5) Percent recurrence
递归点百分数
6) zero relative distance
节点归一化
1.
When the revolving bodies are laminated in the radial and the circumferatial directions and stepped in the longitudial direction the zero relative distance method can be used to resolve the repeated node number probl.
当旋转体周向和径向分层且轴向阶梯时,利用节点归一化相对距离判别法,解决了分层或分块时带来的节点和编号的重复问题,对复杂的旋转体三维有限元网格图能一次性自动生成。
补充资料:可递延成本与不可递延成本(deferrablecostandundeferrablecost)
可递延成本是指在企业财务负担能力有限的情况下,对已决定选用的某一方案推迟执行,或将方案中的某一些费用延迟到以后期内再发生等等,这种与推迟方案有关或与延迟支出有关的费用,称为可递延成本,有时也称之为可延缓成本。
不可递延成本是指已选定的某一项方案,或某些执行方案中的某些支出,即使在企业财务负担能力有限的情况下,也不能推迟执行,否则便会对整个经营或投资过程产生重大不利影响。这种与已选定方案有关的,或与方案中某些支出有关的费用,称灾为不可递延成本,也可称之为不可延缓成本。
之所以将成本分为可递延和不可递延,是要求我们在决策过程中,充分注意各项决策相关成本。在企业财务负担能力有限的情况下,应分别轻重缓急,依次排队,量力而行。只有这样,才能更有效地运用现有的资金,提高资金的利用率,最大限度地提高企业经营效益。
不可递延成本是指已选定的某一项方案,或某些执行方案中的某些支出,即使在企业财务负担能力有限的情况下,也不能推迟执行,否则便会对整个经营或投资过程产生重大不利影响。这种与已选定方案有关的,或与方案中某些支出有关的费用,称灾为不可递延成本,也可称之为不可延缓成本。
之所以将成本分为可递延和不可递延,是要求我们在决策过程中,充分注意各项决策相关成本。在企业财务负担能力有限的情况下,应分别轻重缓急,依次排队,量力而行。只有这样,才能更有效地运用现有的资金,提高资金的利用率,最大限度地提高企业经营效益。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条