1) pre-laid method
预铺法
2) pre-laid stick side up method
预铺反粘法
1.
The article introduces the method of capped reverse application used in underground structure of Tianjin Railway Station Back Square and corresponding waterproofing requirements,details fully-adhered method and pre-laid stick side up method with APF self adhered membrane.
介绍了天津站交通枢纽后广场地下主体结构采用盖挖逆作法施工对防水设防的要求,详细阐述了采用APF自粘卷材针对不同防水部位分别作满粘法施工和预铺反粘法施工的防水设计和工艺要求。
3) pre-paving
预铺
1.
Taking construction for replacement of raising speed turnout in Beijing-Jiulong Railway for example,construction preparation,pre-paving of turnout,construction organization and safety and quality methods are introduced to assure engineering convenient.
以京九铁路提速更换道岔施工为例,介绍了施工准备、道岔预铺、施工组织、安全质量措施及施工中应注意的问题等几个方面,确保工程顺利施工。
4) pre-installed and inverted adhered
预铺反粘
5) deviation laying track
偏铺法铺轨
6) Automated tape laying
预浸带铺放
1.
The Numerical control is applied for automated tape laying.
结合大梁带铺放工艺分析了预浸带铺放设备的运动轨迹,采用数控系统完成铺放控制。
补充资料:设备安装前的准备工作——设备的预装配与预调整
设备安装前的准备工作——设备的预装配与预调整 | ||
|
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条