2) the engineering of Banghe
傍河工程
3) exploitation near the river
傍河开采
1.
It analyzes the influence of exploitation near the river to the phreatic cycle,lateral seepage and run-off amount of the lower Yellow River through establishing an under-flowing simulation model.
通过建立地下水流模拟模型,对傍河开采给黄河下游地下水循环、侧渗量及径流量带来的影响进行了分析。
4) riverside pumping
傍河取水
1.
Numerical modeling of steady state 3 D groundwater flow beneath an incomplete river caused by riverside pumping;
傍河取水越河稳定渗流问题的三维数值模拟研究
2.
In this paper, the case study of riverside pumping by Songhujiang River is given for analysis and calculation.
傍河取水是保证长期稳定供水的有效途径,利用地层的天然过滤和净化作用,使多泥沙河水转化为水质良好的地下水。
5) The near-river well
傍河水井
6) mine along a river
傍河型矿床
1.
Analyses of hydrogeological characteristics of a mine along a river and feasibility of utilization of pit water resources——Exemplified by the mines Junde and Xing'an in the Hegang coalfield;
傍河型矿床水文地质特征及矿井水资源化可行性分析——以鹤岗煤田峻德、兴安两矿为例
补充资料:傍傍
1.事务繁剧,忙于奔走应付貌。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条