说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 工况拟定
1)  wave superposed condition
工况拟定
2)  simulation working condition
模拟工况
1.
Research on control strategy for simulation working condition test-bed of magneto-rheological fluid damper;
磁流变液减振器模拟工况实验台控制策略研究
3)  virtual state
虚拟工况
1.
Based on the original definition of slope safety factor,centrifuge loading finite element method(CLFEM) is presented by the "virtual state" of slope for the analysis of slope stability.
从边坡安全系数的基本定义出发,通过边坡"虚拟工况"概念,提出有限元离心加载分析边坡稳定性的方法。
4)  Simulation of Work Complexion
工况模拟
5)  condition fitting
工况拟合
6)  stable operation condition
稳定工况
1.
The stable operation condition and gist of optimize d process under high gasification load condition of coal gasifier were presented from aspects of carbon layer, ash layer, gasification agent and production operation; and the appropriate solvable measures were also presented.
从炭层、灰层、气化剂和生产操作方面提出了煤气炉在高气化强度条件下稳定工况和优化工艺的要领,提出了相应的解决措施。
补充资料:拟定征地方案


拟定征地方案


代欲处地单位群众的生产和生活g理邵门为解址月召片书~,关政策,在进行项目用地选择以及建设项目初步设计正式批准和总平布置图完成之后,组织建设单位和被征地单位及有关部门共同拟定征地费用包干方案。土地管理部门在受理建设单位的用地申请及选址后,一般需作如下工作:(l)及时向被征地单位群众说明征地理由、征地范围以及有关政策法规。禁止用地单位与被征地单位直接商定征地条件。(2)通过对土地的综合评价、分等定级,提出符合当地实际情况的补助、补偿、安置及其他各项费用和补偿安置方案。(3)主持建设单位和被征地单位以及有关部门协商取得一致意见之后,签订征地初步协议,报同级政府审批。国家和省的重点建设项目,按国家有关规定,·由省、市人民政府(或征地咨询服务机构)与建设单位签订征地协议。有条件的,可按国家有关规定,实行征地费用包干。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条