1) active reinforcement method
主动加固法
2) active reinforcement
主动加固
1.
The treatment to retrogressive landslide is passive and active reinforcements,but some problems will be brought in by passive reinforcement,such as the decline of shear strength of sliding surface,the expanse of sliding range,the increase of passive reinforcement force,the loss of project budget and the dest.
牵引式滑坡整治分被动加固与主动加固:被动加固存在着滑面抗剪强度下降、滑动范围扩大、加固力增大等问题,并造成较大的工程损失和环境资源破坏;主动加固能有效利用潜在滑动面的固有强度,减少工程造价。
3) passive reinforcement method
被动加固法
4) active slope reinforcement
边坡主动加固
1.
Taking the assumption that the stress condition of reinforced slope is equivalent to the stress condition of unexcavated slope at the given control points,a new calculation model of active slope reinforcement is put forward on the basis of method of stress control in the critical slip surface.
根据边坡加固的内部机制,建立边坡非线性有限元计算模型;在给定控制点上,以边坡加固后应力状态与边坡未开挖时应力状态为边界条件,提出了基于滑面上应力控制的边坡主动加固计算方法。
5) Active strengthening technique
主动加固技术
补充资料:采用强夯法进行机场停机坪软土地基加固
采用强夯法进行机场停机坪软土地基加固
采用强夯法进行机场停机坪软土地基加固 I
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条