说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 缓和曲线自动绘制
1)  automatic drawing of transition curve
缓和曲线自动绘制
2)  automatic curve plotter
自动曲线绘算器
3)  variplotter [,vɛəri'plɔtə]
自动曲线绘制器,自动作图仪
4)  Curve drawing
曲线绘制
1.
Design of data curve drawing software for liquid rocket engine test;
液体火箭发动机试验数据曲线绘制软件设计
2.
The convenience of the curve drawing under C++Builder is presented,and the disadvantage of drawing components is analyzed under C++Builder,as well as the complexity of arithmetic realization.
概述了C++Builder中曲线绘制的简捷性,针对C++Builder处理数据的繁琐和绘图控件的不足,提出了在C++Builder编译环境中调用MATLAB引擎进行数据处理和曲线绘制的方法。
5)  drawing curve
绘制曲线
6)  easement curve
缓和曲线
1.
Coordinate Calculation of Easement Curve Center and Side Stakes Using VB;
使用VB编程实现缓和曲线中边桩坐标计算
2.
A constrained optimization method for deciding easement curve length in the raising operation speed of the existing railway;
既有线提速时缓和曲线长度的最优化算法
3.
Accuracy analysis of coordinating calculation of easement curve;
缓和曲线坐标计算的精度分析
补充资料:Solidwors2001中绘制和控制样条曲线的方法
SolidWorks2001中绘制和控制样条曲线的方法<在工业产品的造型设计中,为了做到产品良好的视觉效果,经常会使用样条曲线作为草图建立特征。本文将初步介绍一下在SolidWorks2001 中绘制和控制样条曲线的方法。

 


1.              样条曲线的绘制


样条曲线是通过一系列的点进行平滑过渡形成的,这些点称为样条曲线型值点。SolidWorks2001 提供了两种绘制样条曲线的方法,即交替样条曲线绘制方式和拖动式。


n          交替样条曲线绘制方式


交替样条曲线绘制是分别在通过样条曲线型值点的地方单击生成样条曲线的方法。


1)         新建一幅草图,单击“样条曲线”按钮


2)         依次单击图1a)所示的“点1~“点4,并在“点5 ”位置双击,形成图1b)所式的样条曲线。


3)         再次单击“样条曲线”按钮 ,结束样条曲线绘制。


            


说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条