说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 预留施工预拱度
1)  reserved construction pre-arched
预留施工预拱度
2)  construction camber
施工预拱度
1.
The construction cambers were evaluated and analyzed.
采用有限元方法,对府河盘龙大桥主桥三跨预应力连续箱梁桥的悬臂挂篮施工过程进行了数值模拟分析,预测和分析了施工预拱度的大小。
2.
The Sunkou Yellow River bridge is taken as an example to probe into how to get the fabrication camber and construction camber,and the space finite element model of the bridge is established by means of the software Midas/Civil.
以孙口黄河公路大桥为例,探讨采用悬臂拼装施工的大跨度预应力混凝土连续梁桥的制造预拱度与施工预拱度的计算问题。
3)  arch rise left in advance
预留拱度
4)  construction allowance for settlement
施工预留沉降量
1.
Base on the analysis of a real example of determination of dike top construction allowance for settlement for heightening a submerged dike on soft soil,this paper studied and discussed the method for determining the construction elevation in heightening of submerged dike.
通过某软土地基潜堤加高堤顶施工预留沉降量确定方法的实例分析,探讨旧堤加高施工高程确定方法。
5)  pre-camber
预拱度
1.
The application of bridge doctor in steel bridge supervising,measuring and calculating the pre-camber;
桥博在刚构桥监控量测计算预拱度中的应用
2.
Research on Concrete Creep and Application in Pre-camber of Bridge;
混凝土徐变与桥梁的预拱度设置研究
3.
Based on it, this paper build a FEM model to analyze the infulence of construction procedure on the pre-camber setting of this bridges .
福厦客运专线中亚城特大桥为大跨度预应力混凝土连续梁桥,以其为工程背景建立有限元模型,分析悬臂施工中影响预拱度的各项因素,通过合理的计算方法和理论分析确定了桥梁施工过程中在受力和变形方面的工作状态,为类似桥梁工程的施工控制分析提供了参考。
6)  camber [英]['kæmbə(r)]  [美]['kæmbɚ]
预拱度
1.
Cast box beams camber design of Changfeng Bridge;
长风大桥现浇箱梁预拱度设置方法
2.
A study on setting parametric camber of large-span curved continuous rigid frame bridge
大跨曲线连续刚构桥预拱度的参数化研究
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条