说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 铁芯柱
1)  core leg
铁芯柱
1.
The tightening methods of legs in power transformer cores are introduced;A tightening device for large core leg is showed,and proved to be feasible by the formula derivation.
介绍了电力变压器铁芯柱的夹紧方式,提出一种用于大直径铁芯柱压紧装置,并用公式推导证明其可行。
2)  barred core
圆柱型铁芯
3)  two-legs type core
双柱式铁芯
4)  ferrite pillar magnetic core
铁氧体柱形磁芯
5)  single-phase three-limb core
单相三柱铁芯
6)  core column
芯柱
1.
Experimental study of bond strength between the core column self-compacting concrete and steel bar;
芯柱自密实混凝土与钢筋握裹强度的试验研究
2.
A study on hollow brick and conrete construction of core column under shearing stress;
带芯柱混凝土小型空心砌块墙体抗剪承载力试验研究
3.
The small-size concrete hollow block wall with two-row-holes can not set up core columns due to the small cavity in the two-row-hole block, thus placing constructional columns become the main structural form in these buildings.
双排孔混凝土小型空心砌块中间孔洞较小无法设置芯柱,故设置构造柱是提高这种砌块建筑水平抗侧力性能的主要措施。
补充资料:Z8612热芯盒射芯机操作规程
1、遵守铸造设备通用操作规程。
2、工作前还必须遵守:
a、
检查设备上行程开关和碰块的位置是否正确,如不正确,必须调整。
b、
接通电源,打开压缩空气伐门,先用手动方法,对各机构逐进行点动试车,然后用自动方法,进行一个循环试车,确认一切正常后,方可进行生产。
3、工作中还必须遵守:
a、
在设备开动后,一个循环未完成时,不许中途调整电器,以免发生误动作,造成设备人身事故;
b、
设备的每一个循环后,必须用喷咀清除芯盒上残存的砂子,并喷涂分型剂;
c、
在未切断电源和所气源前,不准将手伸入芯盒和夹紧器之间的空隙处,或把手放在导轨上,以免发生人身事故。
d、 一般不准空射,如必须空射,一定要把压缩空气伐门关小;
e、 如果用手操作,不准同时操作两个电器开关。
4、工作后还必须遵守:
a、
操纵各个电器开关,使设备各机构恢复到原始位置,然后切断电源和气源;
b、 折下射砂头,清理积砂和粘砂;
c、 清除排气塞内的粘砂;
d、
取下射砂筒,清除缝隙中的粘砂,最后用石蜡涂擦内壁,但不要将缝隙堵塞;
e、 清除闸板上的积砂,并在闸板上涂石墨粉,以减少磨擦;
f、 清除导轨和导杆上的积灰和积砂,并涂上一层润滑油。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条