1) fixing crack
安装裂缝
2) installation weld
安装焊缝
1.
Comparing test measurements and FE calculation, the affects of factors, such as size and arrangement of heating device, material and specifications of main tube, multi-tube heating, additional main tube heating, to stub tube installation weld heat treatment temperature field.
通过实验测量和有限元计算,研究了加热装置的大小和布置、主支管的材料和规格、多管加热、主管附加加热等因素对接管座安装焊缝热处理温度场的影响。
3) ground fissures in Xi an
西安地裂缝
1.
Study of ground fissures in Xi an by using numerical simulation;
用数值模拟研究西安地裂缝
4) fracture simulation unit
模拟裂缝装置
1.
Studying the influence factors of HCl/dolomite reaction rate by fracture simulation unit;
用人工模拟裂缝装置研究盐酸/白云岩反应速率的影响因素
5) assembly of Maole expansion joint
毛勒伸缩缝安装
6) shank installation
(裂土器)柱安装
补充资料:设备的安装——设置安装基准
设备的安装——设置安装基准 | ||
|
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条