1)  sediment deposition
河道泥沙淤积
2)  river course
河道
1.
Discuss on the research situation of estimating methods of eco-environmental water requirements in river course and its modification;
河道内生态环境需水量计算方法的研究现状及其改进探讨
2.
Discussions on river course ecology and rehabilitation in Shandong, Hai River Basin;
山东省海河流域河道生态问题及治理探析
3.
A theoretical discussion of ecological and environmental water requirements of river course;
河道生态及环境需水理论探讨
3)  river channel
河道
1.
Computing method of divisional ecological and environmental water requirement for river channel and its application to the Yellow River Basin;
河道生态环境分区需水量的计算方法与实例分析
2.
Study on the situation of sand-gravel extraction in the river channel;
采砂对河道的影响分析及治理措施研究
3.
Preliminary study on the characteristics of scouring and sedimentation of river channels in recent decades in the Zhujiang Delta;
珠江三角洲河道近期冲淤特征初步分析
4)  channel
河道
1.
Auto-regulating function of channel of Lower Weihe River since 1960;
1960年以来渭河下游河道的自动调整作用
2.
Study on channel friction parameter inversion based on Kalman filter with unknown parameter vector;
基于带参数的卡尔曼滤波的河道糙率动态反演研究
3.
The application of frequency-shared interpretation tech-nique to channel sandbody description in upper Ng of Zhuang 106 area.;
分频解释技术在桩106地区馆上段河道砂体描述中的应用
5)  river
河道
1.
Effective Methods to Realize Long-Time Management of City-river;
实现城市河道长效管理的有效途径
2.
Mathematics analyse and generalization on storage volume and scour and silting amount by cross-section surveying means in rivers and reservoirs;
布设断面测算河道水库容积及冲淤量的数学解析与概化
3.
Research on a GIS-based automatic generation algorithm of body-fitted meshes adaptive to river terrain;
基于GIS的河道贴体网格自动生成算法研究
6)  riverway
河道
1.
Influence of riverway on transmission of blasting seismic wave;
河道对爆破地震波传播规律的影响分析
2.
Preliminary study on standard of riverway-digging effect forecasting;
河道开挖效果预测方法初步研究
3.
Relationship between Yangzte riverway fractal and geological structure of the catchment;
长江河道分形与流域构造特征的关系
参考词条
补充资料:坝区泥沙淤积


坝区泥沙淤积
sedimentation in dam area

boqLJ rl}sho ytljl坝区泥沙淤积(Sedimentation in dam area)河流上筑坝塑水后,由于塑水区内水深加大,流速降低,泥沙沿程淤积,并向坝前推进,造成坝前泥沙的淤积。坝区泥沙淤积产生的问题主要有:①在船闸引航道中及其口门附近产生淤积,使航深不足或水流不顺而有碍通航。②电站进水口前的泥沙堆积使过机水流中的含沙量增大,泥沙变粗,造成过水建筑物或水轮机过流部件的严重磨损。③坝前泥沙淤积有可能影响问门启闭,堵塞泄水孔,影响大坝安全。 以通航为主的枢纽和以发电为主的枢纽对坝区水流条件的要求不同,防治坝区泥沙淤积的措施也不一样。 (1)以通航为主的枢纽。宜将船闸布置在靠近稳定深乱线一侧,要避开弯道的凸岸和回流、缓流区。这些地区都是泥沙集中淤积处,且淤积后又难于冲走。结合各个工程的实际情况,可设置某些导流排沙工程,如修建引航导墙以破除回流减少淤积;设置底部高程较低的冲沙闸,以定期冲刷上游及下游引航道淤沙。 (2)以发电为主的枢纽。高水头水电站的防沙措施主要是设置高程较低的排沙孔。排沙孔布置在机组进水口的下面,防沙效果最好,但结构复杂,施工及管理都不便。一般把排沙孔设在进水口的侧下方,其位置以使进水口处在冲刷漏斗的影响范围之内为原则。低水头枢纽的防沙措施,主要是进行合理的平面布置。如利用弯道环流特性,正面取水,侧面排沙,同时设置导沙坎,常能取得较好的防沙效果。在中小型水库中,也可采取清浑水分治的办法,即在童水区上游修建排浑渠(或排浑洞),当汛期洪水人库时,可将浑水通过排浑渠(洞)直接排往坝下游,减少主库淤积,缓解坝区泥沙问题。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。