1) manufacturing resource limits
制造资源约束
1.
Supply chain optimal algorithm based on manufacturing resource limits;
基于制造资源约束的供应链优化算法
2) Resource Constraint
资源约束
1.
Economic Explanation of "Growth with Resource Constraint";
“资源约束下经济增长”的经济学解释
2.
Time-resources tradeoffs of PERT construction schedule under resource constraints;
资源约束下PERT施工进度计划的优化
3.
A CAPP System Based on Resource Constraint;
基于资源约束的CAPP系统
3) Resource-constrained
资源约束
1.
Scheduling Resource-constrained Project with Critical Chain Management;
关键链法解决资源约束下的项目流程问题
2.
Research of Multi-Mode Resource-Constrained Project Scheduling Problem Based on Genetic Algorithm;
基于遗传算法的多模式资源约束项目调度问题研究
3.
To handle this problem,a genetic algorithm for solving resource-constrained project scheduling is presented in this paper.
资源约束型项目调度的优化是一个NP-hard问题,其求解难度随着资源约束项的增多呈指数方式增长,传统的基于Excel表的手工优化方法不能及时计算出有效的资源配置方式,从而影响项目管理人员的资源调度。
4) resource constraints
资源约束
1.
Resource constraints and regional economic convergence——on the basis of observation on resource scarcity and resource allocation power;
资源约束与地区经济收敛——基于资源稀缺性与资源配置力的考察
2.
The development of Beijing industries in the context of resource constraints;
资源约束下北京都市产业的发展
3.
Research on Economic and Social Development Path of Suzhou City under Resource Constraints;
资源约束下的苏州市经济社会发展道路研究
5) resource constrained
资源约束
1.
Based on the study of flexible job shop scheduling problem(FJSP),the model of multi-objective FJSP under resource constrained was established.
在柔性作业车间调度问题模型的基础上,针对资源约束作业车间调度问题及多目标柔性作业车间调度结合的问题,建立了资源约束下多目标柔性作业车间调度问题的数学模型,提出了启发式活动调度算法与遗传算法结合来对模型进行求解。
2.
In this paper we discuss the resource constrained scheduling problem 1|p\-j=b\-j-a\-ju\-j,nj=1u\-j≤|W jC j and give the method of how to arrange the tasks under special situations.
讨论了资源约束排序问题 1|pj =bj-ajuj, nj=1uj ≤ ^U| WjCj 的几种特殊情况 ,给出确定任务排列顺序的方法 。
3.
Highway & Bridge Project, a large-scale and complicated project program, needs shorter and shorter time limit for a program, however, in the construction, a great deal of indefinite factors abound, especially the resource constrained.
资源约束下的项目进度安排问题受到普遍重视,已经成为当今项目进度管理的研究热点。
6) resource restriction
资源约束
1.
A Study on the Response Policy Choice for the Project s Regional Risk Based on the Resource Restriction;
基于资源约束的项目区域风险回应策略选择研究
2.
Resource Restriction of Domestically Economic Activity and Assumption of the New Economic man;
现代家庭经济活动的资源约束与新经济人假定
3.
The paper improves the activity quonce rule,which makes projct plan meet multi-resource restriction and total plan meet muliti-resource restrict ion and total time not to be dalayecl possibly or delayed in minimum.
在PERT和CPM中,对于资源约束优化的工序准则大多数是采用最小时差法则,本文提出了多资源约束下新的工序排序准则,使工程计划安排满足资源约束,且使总工期总可能不拖或拖延最少。
补充资料:森林资源(见世界森林资源、中国森林资源)
森林资源(见世界森林资源、中国森林资源)
forest resources
sen Iin ziyuon森林资源(forest resources)见世界森林资源、中国森林资源。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条