1) groundwater well system
地下水井群系统
2) groundwater system of mine
矿井地下水系统
3) groundwater system
地下水系统
1.
Selection of standard oil for analyzing oil in groundwater system by ultraviolet spectrometry;
紫外分光光度法测定地下水系统中油类的标准油选定
2.
Current situation and development trend of numerical simulation of groundwater system;
地下水系统数值模拟的研究现状和发展趋势
3.
Study of random economic management model for groundwater system in Kashi City;
喀什市地下水系统随机经济管理模型研究
4) underground water system
地下水系统
1.
Presents the design of the underground water system and control system.
介绍了水源热泵地下水系统及其控制系统的设计。
2.
The underground water system of the Tong Liao area is identified and analyzed using the internal and outside information of the underground water system.
本文利用地下水系统的内外部信息对通辽地区地下水系统进行了辨识与分析。
5) under mine storage-drainage system
井下蓄排水系统
1.
Calculation methods for number of water pipes under mine storage-drainage system in Xiaqiao coal mine;
夏桥矿井下蓄排水系统放水管数计算方法
6) underground drainage system
井下排水系统
1.
The article tries to make use of SCM controlling technology to detect and control the underground drainage system of coal mine long and continuously, in order to make the drainage system work at the best status , and reach the aims of saving energy, promoting the reliability of safety production and bringing down the productive cost.
煤矿井下排水系统是煤矿安全生产环节的重要组成部分。
补充资料:大水井建筑群
位于利川市区西北47公里的柏杨坝区,由“李氏宗祠” 和“李氏庄园” 两大建筑组成,分别建于清道光和光绪年间,总建筑面积12000平方米。
其中宗祠的建筑模式模仿成都文殊院,祠堂依山建有石墙堞垛,上有炮眼;庄园距祠堂150米,有大小房间一百多间,二十多个天井,整个建筑错落有致,工艺精巧。
门票:15元
交通:先从利川乘坐中巴车前往柏杨坝,再从柏杨坝转车前往。或者直接从利川或者柏杨坝包车前往。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。