1) Heyuan power plant
河源电厂
1.
On the base of the boiler technical negotiation of Heyuan power plant,this article discusses the specialties,such as parameter,configuration,firing system,material and start-up system, of the Mitsuibishi Heavy Industries Co.
依据河源电厂600MW超超临界燃煤机组锅炉技术谈判,对日本三菱公司的600MW超超临界锅炉的特点,如参数、结构、燃烧系统、材料、启动系统选择等进行论述。
2) Douhe power Plant
陡河电厂
3) Hejin power plant
河津电厂
4) river power plant
河立电厂
5) station power
厂用电源
1.
Discussion on criterions of station power transfer device;
关于厂用电源快切装置切换判据的探讨
6) power plant heating source
电厂热源
补充资料:IGCC电厂(见整体煤气化联合循环电厂)
IGCC电厂(见整体煤气化联合循环电厂)
Aintegrated gasification combined cycle plant
IGCC电厂bined eyele(integrated gasifieationConl一plant)见整体煤气化联合循环电厂。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条