1) Yihei Reservoir
迤黑水库
1.
Application of Exploratory Pits in Dam Grouting Test of Yihei Reservoir;
坑探在迤黑水库大坝灌浆试验效果检查中的应用
2) Heihe Reservoir
黑河水库
1.
Optimization of conjunction for bank slope at inlet of spillway tunnel of Heihe Reservoir;
黑河水库溢洪洞进口岸坡连接型式优化选择
2.
Three-dimension numerical simulation of leakage and leak-proof in left dam abutment of Heihe reservoir;
西安市黑河水库左坝肩渗漏与防渗三维数值模拟研究
3.
Taking the arc fracture on the right shoulder of Heihe reservoir dam as example the forming mechanism of plane rotation slope is analyzed.
从黑河水库右坝肩上滑坡体的典型特征———弧形裂缝入手 ,分析了该滑坡体的形成机制 ,并由此提出了稳定性评价计算公式。
3) the Heiquan reservoir
黑泉水库
1.
Because of its geographic location of the Heiquan reservoir s sandgravelfill dam with concrete face plate, the temperature is very low, the temperature change is very big between daytime and night and it s very difficult for face plate crack prevention.
黑泉水库混凝土面板堆砂砾石坝所处地理位置气温低而寒冷 ,昼夜温差大 ,对面板防裂极为不利。
4) Heiquan reservoir
黑泉水库
1.
Analysis of No.20 face lift cause for concrete face dam in Heiquan reservoir;
黑泉水库混凝土面板坝面板抬动原因及处理
2.
Design of concrete face slab dam periphery fissure waterstop in Heiquan reservoir;
黑泉水库混凝土面板坝周边缝止水设计
3.
Ecology Endanger and Control Countermeasures around Heiquan Reservoir;
黑泉水库周边生态危害及治理对策
5) Heilongtan Reservoir
黑龙滩水库
1.
The relationships among Urease Activity(UA), Phosphatase Activity(PA) and parameters of water quality in the aquatic ecosystem of Heilongtan Reservoir have been studied.
本文对黑龙滩水库水体生态系统中脲酶与磷酸酶活力及其与多种水质参数之间的关系进行了研究,结果表明:(1)酶活力与水质、水温变化呈现出一致的动态变化规律。
6) Heisonglin Reservoir
黑松林水库
1.
Fracture grouting applied to strengthening of dam for Heisonglin Reservoir;
劈裂灌浆施工技术在黑松林水库坝体加固中的应用
补充资料:弥迤
1.地形平坦延绵貌。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条