说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 基础换填
1)  foundation replacement
基础换填
1.
From three aspects,the paper discussed how to treat with the soft subgrade by foundation replacement method for highway retaining wall,and proposed its design methods for reference.
通过原理分析、换填层设计和换填层施工三方面阐述了采用基础换填法处理公路挡土墙软弱地基。
2)  back filled foundation
回填基础
1.
The back filled foundation of the High Level Gate Machine in Three Gorges Project is studied, By using the random analysis method the random effect factors are analyzed, the calculation method for subsidence of back filled foundation is given, also the analysis method for reliability evaluation of the subsidence is proposed.
研究了三峡工程施工中的高架门机的回填基础 ,应用随机分析方法对该回填基础的随机影响因素进行了分析 ,提出了回填基础随机沉降的计算模式 ,以及沉降预测的可靠度分析方
3)  rock fill foundation
填石基础
4)  base and backfill
基础与回填
5)  foundation filling soil
基础回填土
1.
Discussion on the quality control of foundation filling soil;
谈基础回填土的质量控制
6)  foundation underpinning
基础托换
1.
Analysis and design of foundation underpinning for No.1 subway Guangzhou;
广州市地铁一号线基础托换工程的理论分析与设计
2.
The article presents a practical engineering example,introducing the application technology of prefabricated short silent piling in foundation underpinning.
结合工程实例,介绍静压预制短桩在既有建筑基础托换中的应用技术。
3.
The treatment of the foundation underpinning has been conducted successfully and obtained good results.
该文针对阳泉某综合办公楼开裂变形情况,分析了该建筑物沉降开裂的原因,提出了基础托换的设计方案及施工工艺,成功地进行了基础托换处理,收到了良好的效果。
补充资料:基础托换
      对原有基础进行加固和更换,以改善基础工作状态的技术措施。基础需要托换的原因很多,如在现有建筑物下进行隧道施工;地下水位下降引起房屋下沉;原有基础腐蚀或损坏等。托换技术已有数百年历史。但是,直到20世纪,由于大量兴建地下铁道,此技术才得到较大发展。
  
  常用的托换技术有:①将拟托换的基础上的荷载传递到桩(或沉井)上。设置桩的方法有:千斤顶压入法、打入法及钻孔灌注法等。桩可能是粗直径的,定向排列的群桩,也可能是细直径的、不定向排列的树根桩。②从原结构物基底向下挖坑达到合适的地基持力层,然后用混凝土填充形成墩,使荷载传给墩;或者将基础扩大,以减小基底压力。这些方法适用于地下水位以上的基础。
  
  托换基础施工要严格控制质量,保证原有基础与托换部分连接,使荷载能有效传递。同时,施工需分段进行,以避免原有建筑结构的应力变化过大,使安全得到确实保证。有时将基础托换与地基处理措施(如化学灌浆)结合进行,可以得到较好的效果。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条