1)  Wushaoling tunnel
乌鞘岭
1.
Due to the features of Wushaoling tunnel, the Owner places great emphasis on the emergency rescue and disaster prevention and construction safety.
根据乌鞘岭隧道特点,介绍了建设单位重视隧道救援防灾和施工安全工作,充分利用设计、施工、监理、科研单位及专家咨询活动,策划隧道施工和运营期间的救援防灾预案,不断优化隧道防塌安全技术措施,并认真组织实施,收到了良好的成效,做法是可行的。
2)  Wushaoling tunnel
乌鞘岭隧道
1.
Experimental identification of the structure safety in the section of Silurian slate with sandwiched phyllite in Wushaoling Tunnel;
乌鞘岭隧道志留系板岩夹千枚岩地段结构验证试验研究
2.
Investigation and implementation of construction ventilation for an inclined shaft of Wushaoling tunnel;
乌鞘岭隧道斜井施工通风研究与实施
3.
Research on Parameters of Initial Support for Phyllite Stratum at Wushaoling Tunnel;
乌鞘岭隧道千枚岩地层初期支护参数研究
3)  Wuxiaoling Tunnel
乌鞘岭隧道
1.
Construction scheme for Wuxiaoling Tunnel (1);
乌鞘岭隧道施工组织方案(上)
2.
Taking the construction of the left line (DK169+570~DK172+083) of Wuxiaoling Tunnel as the example, this paper introduces the application of TSP203, the latest tunnel geological advanced prediction system.
乌鞘岭隧道左线(DK169+570~DK172+083)施工为例,介绍了最新的隧道地质超前预报系统TSP203技术的应用。
3.
Wuxiaoling tunnel during double tracking of lanzhou Wuwei section in Lanzhou Xinjiang Railway with a total length of 20.
乌鞘岭隧道位于兰新铁路兰州—武威段增建二线上 ,全长 2 0 。
4)  Wuqiaoling tunnel
乌鞘岭隧道
1.
Key Measures for Mountain-crossing of Wuqiaoling Tunnel;
乌鞘岭隧道越岭攻关措施
2.
Problem of soft rock in NO.7 slanting shaft of Wuqiaoling tunnel and support technology;
乌鞘岭隧道7号斜井软岩问题及支护对策
3.
Wuqiaoling tunnel,the longest single-track railway tunnel in China,is the key project of Lanzhou— Urumchi Railway.
乌鞘岭隧道是兰新线重点控制工程,是国内最长的单线铁路隧道。
5)  Wuqiaoling long tunnel
乌鞘岭特长隧道
6)  Wushaoling long and deep-buried tunnel
乌鞘岭长大深埋隧道
1.
Wushaoling long and deep-buried tunnel passes through the east foot of Qilian Mountain,with the length of 20 050 m and the maximum burial depth of 1 050 m.
乌鞘岭长大深埋隧道横穿祁连山东麓,长达20050m,最大埋深1050m。