说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 可靠性寿命周期费用
1)  Reliability Life Cycle Cost(RLCC)
可靠性寿命周期费用
2)  Life Cycle Cost
寿命周期费用
1.
Analysis of life cycle cost for asphalt pavement in permafrost zone;
多年冻土区沥青路面寿命周期费用分析
2.
Data Collection and Grey Processing Method of Life Cycle Cost for Torpedo;
鱼雷寿命周期费用数据的采集与模糊处理方法
3.
Influence of reliability and maintainability design on Life Cycle Cost of locomotives;
可靠性、维修性设计对机车寿命周期费用的影响
3)  life-circle cost
全寿命周期费用
1.
In order to change people s traditional economical view and the values bias that green buildings are costly,the composition of green building s life-circle cost and its economic and technical evaluation index system is studied in this paper.
研究了建筑全寿命周期费用的组成及绿色建筑经济技术评价指标体系,从全寿命周期费用的角度来考察绿色建筑的经济效益,改变人们用传统的经济观和价值观对绿色建筑"高成本"的片面认识,使开发和保护绿色建筑成为人们的自觉行动。
2.
By weighing synthetically the two factors which are testability of system and life-circle cost of equipment,we determine the system level testability index of complicated equipment is determined on the basis of maximum availability and minimum life-circle cost.
通过综合权衡系统可用度和装备全寿命周期费用这两方面因素,以系统可用度最大、装备全寿命周期费用最小为评价目标来确定复杂装备系统级测试性指标;建立了系统可用度和装备全寿命周期费用的数学模型,并通过合理的假设,将双函数的最值优化问题转化为在不等式约束条件下的单函数最值优化问题,最终得到了确定系统级测试性指标的数学模型;最后,通过一个实例,采用遗传算法并借助MATLAB软件平台完成了对数学模型的求解,验证了该方法的可行性。
4)  life-cycle cost
全寿命周期费用
1.
Selection and life-cycle cost analysis of water chillers for Nanjing Metro;
南京地铁冷水机组选择与全寿命周期费用分析
2.
The current pricing model used by our army follows the pricing criteria of "military approach to price management", and there are some defects, for example, the existence of "cost-black hole", many times calculation of the profit, not considering the life-cycle cost, the lack of incentives, and the mechanical pricing time and so on, it is urgently needed to
重点分析当前《军品价格管理办法》中规定的定价模式,指出当前定价模式存在“成本黑洞”,利润重复计算,不考虑全寿命周期费用,缺乏激励,审价、定价时机机械等问题,急需进行完善。
5)  life circle cost
寿命周期费用
1.
This paper studies the models of operational effectiveness,life circle cost,risk and research schedule about weapons,and gives a synthetic conceptual design method based on synthesizing these four indexes.
对武器装备的作战效能、寿命周期费用、风险和研制周期的模型进行了研究,提出了综合运用这四维指标作为目标函数的武器总体综合设计的思路和数学模型,可以全面而系统地认识武器装备的发展问题,避免设计中由于只注重提高性能而引起的弊端。
2.
Considering that it has to take cost to promote aircraft survivability, a synthetic tradeoff model of aircraft survivability and life circle cost is built.
分析了飞机生存力的影响因素,基于每个因素对生存力的影响重要程度提出了评估飞机生存力的权重系数法和综合评估法;并考虑到飞机生存力的提高必须以费用作为代价,提出了一种飞机生存力/寿命周期费用综合权衡方法。
6)  life cycle cost
全寿命周期费用
1.
Research on Application of Life Cycle Cost Management
全寿命周期费用管理应用研究
2.
The authors of this paper use this LCC analysis method to determine the life cycle cost of engineering equipment,thus forming a basis for the development scheme and the selection of engineering quuipment.
应用 LCC分析法可确定某工程装备的全寿命周期费用 ,为某工程装备的研制方案和选型决策提供依据。
3.
The life cycle cost is divided into the one-off investment cost and the operation-maintenance cost according to the actual situation of power supply enterprises in China,and the quantitative model on lift cycle cost of electrical equipment is proposed.
针对我国供电企业的实际情况,将电力设备费用分为一次投资费用和运行维护费用两部分,建立了电力设备全寿命周期费用定量模型。
补充资料:寿命周期费用


寿命周期费用
life cycle cost; LCC

  Sh以Jming zha门1 fel卯ng寿命周期费用(life cycle酬;比c)又称全寿命费用。产品在其整个寿命周期中的爪计费用,是产品从形成概念到被处理废弃的时间间隔内所循消耗的一切资源全部量化为金额后的总和。产品的寿命周期包括概念和定义、设计和开发、制造、安装运行和维修、处置等5个主要阶段。故寿命周期费用按定义即为概念和定义费用、设计和开发费用、制造费用、安装运行和维修费用、处置费用之和。所有发生在上述5个阶段的费用又可划分为采办费用和拥有者费用两大类,因此,寿命周期费用也等于采办费用加拥有者费用。 寿命周期费用应无遗漏,无重复地计及一切发生在产品寿命周期内的直接、间接、一次性、重复性和其他有关费用之和,而不管费用来源的渠道和管理的隶属关系。 发展过程20世纪后半叶,随着武器装备性能的改进和提高,不仅其采购费用大幅度增加,更导致其使用维修费用急剧上涨,数额可达前者的几倍。军费开支的迅速膨胀,成为美国国防部的沉重负担。于是把寿命周期费用作为专门问题于印年代开始进行系统研究,其目的在于控制军费。 美军于1971年7月颁布了《寿命周期费用评价指南)(比C一l)和(寿命周期费用估计采购案例汇编)(比C-2)。1973年1月颁布了《采办的寿命周期费用分析和估计指南》,即珑C-3。文件规范了寿命周期费用的定义、估算、分析和评价方法以及管理程序等。它的应用由美国国防部门发展到政府机关、民间产业界及很多发达国家。1987年11月国际电工委员会(IEc)颁布了《寿命周期费用评价—概念、程序及应用》标准草案,l卯8年8月,中国颁发了公田22 21)517(武器装备寿命周期费用估算》国家军用使用标准。 基本内容寿命周期费用的技术包括寿命周期费用估算、寿命周期费用分析、寿命周期费用评价和寿命周期费用管理等内容。 ①寿命周期费用估算。把产品在其寿命周期内消耗的全部资源量化为金额累加以得出总费用的过程。首先,按产品的硬件、软件和寿命周期各阶段的工作项目,将寿命周期费用逐级地分解为主费用单元,子费用单元直至可以进行计算的基本费用单元,形成倒树状的费用分解结构。此项工作称为费用分解。然后是进行费用计算,由基本费用单元开始,逐项计算费用,累加成为上一级费用单元的费用,直至算出整个寿命周期费用。寿命周期费用的估算方法有4种,应根据估算的目的、估算所处的阶段和所掌握的数据资料分别或综合采用。它们是:a.工程估算法。一种自下而上的详细估算方法。从最墓本费用单元开始,用工程的方法计算出其费用,逐级累加,得出寿命周期费用。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条