说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 径流式水电站
1)  run-of-river hydropower station
径流式水电站
1.
Economic operation algorithm based on self-organization evolutionary programming for run-of-river hydropower station;
基于自组织进化规划的径流式水电站厂内经济运行算法
2.
On the basis of analysis of the operation experience of the Bailongtan Hydropower Plant, the definition of and calculation method for the electricity loss caused by abandoned water of run-of-river hydropower stations without regulation are discussed.
通过对百龙滩电厂实际运行经验的分析,探讨无调节性能的径流式水电站的弃水损失电量的定义和计算方法,并结合实际情况提出了如何提高水能利用率、尽可能发挥水库最大综合效益的方法及对策。
3.
This paper introduces the concept and the method of calculating installation sequential capacity for run-of-river hydropower stations.
提出了径流式水电站安装时序容量的概念和计算方法。
2)  run-of-river small hydropower station
径流式小水电站
1.
A comprehensive model for prediction of annual energy output of run-of-river small hydropower station;
径流式小水电站年发电量综合预测模型
3)  run of river plant
径流式水电站<能>
4)  water diversion run-of-river power station
引水径流式电站
5)  run-of-river power station
低水头径流式水电站
1.
This article introduces the metal structure layout and design of flood-releasing sluice,power house,and boat lock of Rongjiang Guding power station and expounds the design thought of every part of metal structure in the run-of-river power station.
文章介绍了融江古顶水电站泄洪闸坝、发电厂房、船闸3个部分的金属结构布置及设计,阐述了低水头径流式水电站中各部分金属结构的布置设计思路。
6)  run-of-river plant
径流式电站
1.
Taking the Suzhi HPP on the Yellow River as an example,this paper analyzes the 2 types of axial flow Kaplan turbine and bulb tubular turbine,and discusses in detail the new economic method for determination of turbine setting elevation for low head run-of-river plant.
以黄河上游苏只水电站为例,对轴流转桨式与灯泡贯流式2种机型进行分析,详细讨论确定低水头径流式电站水轮机安装高程新的经济方法,并论证其合理性,突出下游设计尾水位的选取,抬高了安装高程。
补充资料:径流式水电站
      对天然径流过程不作任何人为改变,发电量仅依天然来水决定的水电站。又称无调节水电站。这种水电站虽建有大坝,但库容很小,不能起到有效的调节库水作用,常常是丰水季满足发电后仍弃水很多,枯水季又无足够的水可供发电。径流式水电站所以不能具有相当规模的调节库容,主要是受到天然地形的限制。也有些地方若建高坝后可以得到大的有效调节库容,但由于迁移人口过多,淹没土地面积很大,需要花过高的代价才能换取,从经济上看很不合理,最后不得不放弃大库容方案而建设径流式水电站。径流式水电站有保证的出力很小,只能季节性发电,运行很不灵活,需要有调节性能好的大库容水电站或者依靠电力系统中的电能作补偿调节,弥补其枯水季少发电或不发电的缺额,以提高它的电能质量。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条