1) plantwide control
厂级控制
1.
This paper firstly introduces the design steps and achiving methods of the plantwide control, which includes two main parts: “Top-Down” analysis and “Bottom-Up” design and seven steps; then applies the method to a plantwide system of gas-steam combined cycle power plant.
厂级控制主要处理控制系统结构方面的问题,解决控制什么,测量什么,需要采用哪个输入变量,以及被控变量与输入变量之间的搭配关系。
2.
Plantwide control deals primarily with the structural issue of the control system,and determines what to measure and control, which inputs to use, and how to pair thesesets of variables by quantifying methods, in order to look for using the simplest methodto satisfy the system control requirement.
厂级控制着眼于系统控制结构的设计,通过量化的方法来选取系统的操纵变量和被控变量,以及它们之间的控制关系,以寻求用最简单的控制策略来满足系统的控制要求。
2) plantwide process control
厂级控制
1.
The relation between the configuration and rejecting disturbance performance of plantwide process control systems (PWCS) was analyzed.
分析了厂级控制系统结构与抗干扰性的关系,提出了一种基于频率响应法的厂级控制系统结构选择与设计方法,对系统总体性能给出了定量化解释,该方法便于厂级生产过程的工艺集成设计、控制结构设计和系统优化,提高了系统的整体性能。
2.
The anti-disturbing and integrated performance of plantwide process control systems are analyzed.
分析了现有厂级控制方案的抗干扰性和整体性能,提出了一种基于频率响应法的厂级控制系统结构设计方法,该方法便于化工过程的工艺集成设计、控制结构设计和系统优化。
4) plant-wide control
全厂控制
1.
In order to achieve optimal operation,it is necessary to implement the plant-wide control or global system control.
全厂控制是未来污水处理系统过程控制发展的必然趋势,欧美等发达国家正在大力开展这方面的研究,而我国对此研究相对落后。