1) Shear hole
竖孔
2) drainage salinity through stand-hole
竖孔排盐
1.
According to the situation on back-salinity at clay interlayer in Gansu Shule River irrigation area,the improvement technology on drainage salinity through stand-hole was suggested to adopt in Shule River irrigation area.
针对甘肃省疏勒河灌区粘土夹层土壤的阻水滞盐作用,提出了竖孔排盐改良技术。
3) perpendicular hole
竖向开孔
4) end construction tile
竖孔砖
5) shaft penetration
竖井穿孔
6) sptue hole
竖浇道孔
补充资料:第二孔(继发孔)型缺损
第二孔(继发孔)型缺损
ostium secondary defect
是心房间隔在形成上发生障碍,一般缺损较大,多在卵圆孔附近称第二孔(继发孔)型缺损。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条