1) external water load
外水荷载
1.
The result indicates that the lining s stress is different in consideration of external water load and not.
在“控制排水”原则下对一标准断面隧道衬砌结构进行了受力分析,分析结果表明,考虑外水荷载时衬砌结构受力与不考虑外水荷载有着明显的不同,只要衬砌背后承受一定的外水压力,衬砌的安全系数就会迅速下降,对衬砌受力极为不利,在保证安全的情况下,衬砌结构最大能承受100m的外水头压力。
2.
Up to now, the drainage and waterproof system design of most railway tunnels in China didn t consider the action of external water load, based on the principle of unlimited drainage, so a great number of railway tunnels have the problem of leakage water, some of which are very serious.
到目前为止,我国大部分铁路隧道防排水设计主要按“无限制排水”、尚未考虑外水荷载的作用,按这样的原则设计隧道防排水存在许多缺陷,有“十隧九漏”的说法,带来了很多严重问题。
2) external water pressure
外水压力荷载
3) external load
外部载荷
1.
It changes the external load into the internal force of the cooling bed and gets rid of it.
将外部载荷转化为冷床自身内力消除掉。
2.
A method to determine the car s wheel-bearings external load(CWEL) was developed from this model and the characteristic of the CWEL was presented.
采用基于轿车线性化刚体运动的稳态转弯模型对轮毂轴承外部载荷进行推导计算,进而对轴承外部载荷的特性进行了分析。
4) external loads
外载荷
1.
In this article, a calculation model is madeup in which the external loads are considered in reinforcement design through Equal-area method.
对于低压高塔,按标准提供的等面积方法(仅考虑压力载荷)进行开孔补强设计有时是不安全的,本文针对这一问题,结合工程设计实例和有限元分析,给出了在考虑风载荷、地震载荷等外载荷作用下,按照等面积原则进行开孔补强设计的解决方案。
2.
The external loads on the A-type gate crane foundation and its reinforcement structure are studied.
研究了A型门架基座及加强结构的外载荷,采用有限元法计算了结构在各载荷组合工况下的应力。
3.
In this paper,external loads of hull are predicted by combining theoretical analysis and rule calculation.
文章采用理论计算和规范相结合的方法预报了船体外载荷,采用结构有限元分析法与光弹性试验法相结合的方法,研究了月池开口部位的主甲板和船底板处的应力分布和应力集中系数,为优化月池结构提供了依据。
5) External collapse load
外挤载荷
1.
Effects of cement sheath elastic modulus on casing external collapse load;
水泥环弹性模量对套管外挤载荷的影响分析
6) External load
外载荷
1.
We propose a new method for calculating the load and deformation of such components as bolt-shaped rings and flanges which are regarded as integral components and subjected to external load.
将螺栓、O型圈和法兰环作为一个整体,应用弹性理论,提出了在外载荷作用下各元件的受力与变形的计算方法。
2.
On the basis of analysis for submarine plane hatch wallboard external pressure condition,indicate external load of submarine plane hatch wallboard stability verify should not less than submarine pressure hull calculating loa
本文在分析潜艇耐压艇体内部平面舱壁板受力情况的基础上 ,提出平面舱壁板稳定性校核中外载荷应取不低于潜艇耐压艇体的计算载荷P
3.
Through theoretical analysis and simulation testing,demonstrates the formation of the hydraulic system pressure and the relationship between external load,described in detail how to use the FluidSIM hydraulic(pneumatic) simulation software to the process of system pressure and methods.
通过理论分析和仿真测试论证了液压系统的压力形成和外载荷的关系,详细叙述了如何使用FluidSIM液压(气动)仿真软件进行压力测试的过程和方法。
补充资料:外水压力
外水压力
external water pressure
wai弓}:ui yali外水压力(external water pressure)作用在地下结构或建筑物外壁的水压力。外水压力是水工隧洞或其它地下建筑物的基本荷载之一。对有压隧洞,它对内水压力有抵消作用,但在检修期则成为主要荷载;对无压隧洞,可采取引沐方法减小外水压力。 外水压力的大小与洞外水的埋藏、补给及排水条件、隔水层的位置、周围岩石节理裂隙的分布情况、衬砌本身和周围岩石的透水性能,以及二者的结合情况有关。对较长的隧洞和地下管道,地下水位沿程变化较大,工程地质及水文地质条件复杂,沿线的岩体与建筑物外壁又有一定的嵌固作用,故确切地计算外水压力的数值比较困难。常用的方法是:先根据水文地质条件和工程布置,并考虑水库投入运行后可能引起的地下水位变化等因素,分析确定地下水位线,再将地下水位线以下的水柱高乘以折减系数准,作为估算衬砌外缘的外水压力值。 方值的确定,要结合当地的工程地质、水文地质及防渗、排水等情况,并辅以必要的观测资料,进行全面分析确定。初定时,也可根据工程类比,参照地下水活动情况以及可能采取的工程措施,按最不利的情况选取。当地下水活动很微弱,洞壁有渗水或滴水时,口取为O一0.4;随着地下水活动的加剧,洞内严重流水时,刀值可高达0.65一1.0。当围岩采取防渗、排水措施时,方值可适当降低,但如在确定地下水位时,已经考虑了这个因素,则不宜再降低。当有内水荷载组合时,口值取小值。 实际上,衬砌与围岩可视为一个整体,水荷载是以渗流体积力的方式作用于地下水位线以下的整个岩体,渗流体积力按内外水所形成的渗流场决定。故外水压力是场力而不是边界力。根据这一概念计算隧洞衬砌的应力较为合理,这是目前发展的趋势。 (杨文祥)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条