1) external wall masonry technology
外墙砌模技术
1.
It introduces characteristic of EPS concrete compound wall materials, and illustrates merits of EPS concrete external wall masonry technology from insulation effect、residential environment and utilization area, which to promote energy-saving of building.
介绍了EPS混凝土复合墙体材料的组成特点,从保温效果、居住环境、使用面积等方面阐述了EPS混凝土外墙砌模技术的优点,从而推进并实现建筑节能。
2) Technical Discussion For building Slope Wall
斜墙砌筑技术探讨
3) formwork wall technique
模板墙技术
5) external wall insulating technique
外墙保温技术
1.
On the application of external wall insulating technique;
浅谈外墙保温技术在施工中的应用
2.
It analyses the relation of the main space of living and architectural energy saving,through the introduction of several external wall insulating technique,it discusses the importance of external wall insulating technique to the design of architectural energy saving,to get the good results of better using the natural resource and increasing the energy using ratio in living architecture.
分析了住宅的主要空间与建筑节能设计的关系,通过对几种外墙保温技术的介绍,探讨了外墙保温技术对于建筑节能设计的重要性,以达到更好地利用自然能源,提高住宅建筑中能源利用率的良好效果。
6) EPS external thermal insulation system
EPS外墙保温技术
补充资料:木工支模拆模安全技术操作规程
第1条 模板支撑不得使用腐朽、扭裂、劈裂的材料。顶撑要垂直,底端平整坚实,并加垫木。木楔要钉牢,并用横顺拉杆和剪刀撑拉牢。
第2条 采用行架支模应严格检查,发现严重变形、螺栓松动等应及时修复。
第3条 支模应按工序进行,模板没有固定前,不得进行下道工序。禁止利用拉杆、支撑攀登上下。
第4条 支设4米以上的立柱模板,四周必须顶牢,操作时要搭设工作台,不足4米的,可使用马凳操作。
第5条 支设独立梁、柱模应设临时工作台,不得站在柱模上操作和在梁启模上行走。
第6条 拆除模板应经施工技术人员同意。操作时应按顺序分段进行,严禁猛撬、硬砸或大面积撬落和拉倒。工完前;不得留下松动和悬挂的模板,拆下的模板应及时运送到指定地点集中堆放。
第7条 拆除薄腹梁、吊车梁、行架等预制构件模板,应随拆随加顶撑支牢。
第2条 采用行架支模应严格检查,发现严重变形、螺栓松动等应及时修复。
第3条 支模应按工序进行,模板没有固定前,不得进行下道工序。禁止利用拉杆、支撑攀登上下。
第4条 支设4米以上的立柱模板,四周必须顶牢,操作时要搭设工作台,不足4米的,可使用马凳操作。
第5条 支设独立梁、柱模应设临时工作台,不得站在柱模上操作和在梁启模上行走。
第6条 拆除模板应经施工技术人员同意。操作时应按顺序分段进行,严禁猛撬、硬砸或大面积撬落和拉倒。工完前;不得留下松动和悬挂的模板,拆下的模板应及时运送到指定地点集中堆放。
第7条 拆除薄腹梁、吊车梁、行架等预制构件模板,应随拆随加顶撑支牢。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条