说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 单井涌水量
1)  water outflow from single well
单井涌水量
1.
Then,in combination with the regional hydrogeological condition,the rational well positions were finally determined by comparison of the relative water outflow from single wells on different meas.
利用TEM法,对比分析不同测线视电阻率-深度断面图,得出地下岩层含水层的埋藏条件及富水性,初步确定取水井位;再结合区域水文地质条件,对比分析不同测线中单井涌水量的相对大小,最终确定理想井位。
2)  mine inflow
矿井涌水量
1.
The predicted mine inflow in the ″Jixian Mining Area Geological Exploration Report″ is 250m3/h,but the present actual mine inflow is as high as 1700-2000 m3/h.
集贤矿区地质勘探报告中预测的矿井涌水量是250m3h/,但目前矿井实际涌水量达1700~2000m3h/,通过对开采前后水文地质资料的分析对比与研究认为,对矿井开采后地下水动力条件的变化缺乏足够认识,采用的矿井涌水量预测模型与实际情况不符是导致预测的矿井涌水量与实际涌水量相差很大的主要原因。
2.
Forecasting the mine inflow is exactly important meaning for preventing mine water inrush, mine flooded and other malignant mine accidents.
矿井涌水量是矿山建设和生产过程中单位时间内流入矿井的水量。
3.
To avoid the BP neural network common problem of trapped into a local solution and take advantage of the genetic algorithm\'s global optimization,a BP network optimized by genetic algorithm approach has proposed to predict mine inflow.
为避免BP神经网络极易陷入局部解的问题,针对遗传算法具有全局寻优的特点,提出了用遗传算法优化BP神经网络预测方法,并以刘桥二矿为例,对其矿井涌水量进行了预测。
3)  mine discharge
矿井涌水量
1.
Chaos in mine discharge and its maximum predictable time scale;
矿井涌水量中的混沌及其最大预报时间尺度
2.
Grey Markov Model for predicting mine discharge;
矿井涌水量的灰色马尔可夫预报模型
3.
The spectral analysis method of the mine discharge's time series and its application;
矿井涌水量时间序列的频谱分析及应用
4)  mine hydraulic discharge
矿井涌水量
1.
The long-term evolvement of groundwater system in mining area is infected by the time series of mine hydraulic discharge.
矿井涌水量时间序列包含矿区地下水系统长期演化的信息。
2.
On the basis of introducing the multifractals concept,power spectrum of mine hydraulic discharge act as a characteristic quantify is put forward,in order that the multifractal spectrum from time series of mine hydraulic discharge is calculated combining with Chhabra and Jensen put up instant calculating method.
介绍了多重分形的概念 ,在Chhabra和Jensen提出直接法的基础上 ,给出了以矿井涌水量时间序列的功率谱函数为特征量的多重分形谱的计算方法和步骤 。
3.
On the basis of analyzing the relationship between fractional Brownian Motion and Joseph Effect, and discussing theoretical sense and practical calculable method in Hurst Exponent, the mine hydraulic discharge research using time seriess rescaled rangle analysis method is put forward.
以此为基础,提出了矿井涌水量时间序列分析的域重新标度法。
5)  mine water flow
矿井涌水量
1.
By using the theory of grey control system,the mine water flow is analysedand predicated through establishing mathematical model in Yongchuan Mine,SichuanProvince.
采用灰色控制系统理论,通过建立数学模型,对四川省永川煤矿矿井涌水量进行分析和预测,结果表明,该方法在预测矿井涌水量中是一种简便而有效的好方法。
6)  water amount of deep well
深井涌水量
补充资料:井涌
分子式:
CAS号:

性质:钻井液柱压力不足以控制地层压力,致使地层流体进入并筒而使井口出现含油、含气的泥浆涌出的现象。井涌往往是井喷的先兆。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条