1) management of general contract
施工总承包管理
1.
The management of general contract is very difficult.
香港迪士尼工程具有工期紧、工艺新、标准高、影响大等特点,施工总承包管理难度非常高。
3) Management of General Contracting
施工总承包合同管理
1.
Study and Practice of Management of General Contracting;
施工总承包合同管理研究与实践
4) construction general contract
施工总承包
1.
Difficulties in construction general contract management and countermeasures;
施工总承包管理难点及措施分析
2.
How to be a good project manager in the construction general contract;
论如何在施工总承包项目中当好项目经理
3.
Meanwhile,this paper gives advice on implementing construction general contract to decrease the management difficulty of local government and keeping the construction quality.
基于上述情况,提出采用设计总承包协调各设计单位工作、提高设计质量,加强项目前期策划工作,制定切实可行的项目管理计划和实施组织计划,促进施工管理的科学化、规范化,实行施工总承包模式,简化地方政府管理难度,保证施工质量的建议。
5) general contractor of construction
施工总承包
1.
According to the current situation of our construction enterprises, this paper discusses how to implement HSE system effectively for general contractor of construction from improvement of management and co-operation with other relevant enterprises.
结合我国施工单位的现状,以管理水平的提升和与相关方的合作为切入点,论述了施工总承包企业如何有效实施HSE管理体系的问题。
6) general contract management
总承包管理
1.
This thesis introduces to us Taiyuan airport reconstruction and extension project and discusses types of the plan for general contract management as well as establishment contents and requirements.
结合太原机场改扩建工程项目探讨了总承包管理任务规划的类型和编制的内容及要求。
补充资料:承包人要求发包人作好施工前的准备工作的权利
承包人要求发包人作好施工前的准备工作的权利:施工前的准备工作是整个工程建设过程的重要组成部分,是保证工程建设按期开工和保证工程质量的一个重要环节。发包人应当按照合同的约定作好施工前的准备工作,包括:于施工前办妥正式工程和临时设施范围内的土地租用、征用申请施工许可证,爆破及临时铁道专用线接岔许可证;确定建筑物(或构筑物)、道路、线路、上下水道的定位标桩、水准点和坐标控制点;开工前,接通施工现场水源,电源和运输道路,并按约定清除施工现场的障碍物;组织有关单位对施工图等技术资料进行审定,并按约定的时间和份数提供给承包人。合同中约定由发包人提供材料和设备的,发包人应按照约定的范围和时间向承包人提供材料和设备。根据《合同法》第283条规定,发包人未按照约定时间和要求提供原材料、设备、场地、资金、技术资料的,承包人可以顺延工程日期。并有权要求赔偿停工、窝工等损失。----------出自《合同法》第283条