说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 机械施工计划
1)  plants of mechanical contruction
机械施工计划
2)  construction machinery
施工机械
1.
Effect of fuel oil pollution on use of engine of construction machinery and countermeasures;
燃油污染对施工机械发动机使用的影响及对策
2.
Test study on roadbed construction machinery compose of the desert subgrade;
沙漠地区路基施工机械组合试验研究
3.
Study on the optimal allocation method of construction machinery based on multi-objective optimization;
基于多目标优化的施工机械设备优化配置方法研究
3)  construction machine
施工机械
1.
On the reasonable allocation and management of the construction machines of earth cubic project;
浅谈土石方工程施工机械的合理配置及管理
2.
Optimal Allocation Method of Construction Machine about Highway Surface;
公路路面施工机械的优化配置方法
3.
Object method used to calculate productivity and operation efficiency of construction machine;
用实物法计算施工机械生产率和运行效率
4)  mechanized construction
机械施工
1.
, this paper makes all-round analysis on the influence of the mechanized construction on the smoothness of the road surface, and puts forward some relative problems needing attention in the construction, which have certain guiding function for guaranteeing the smoothness of the asphalt road surface.
从基层平整度、热拌沥青混合料、碾压工艺、摊铺、接缝处理等方面分析了机械施工对路面平整度的影响,并指出了施工中应注意的相关问题,这对保证沥青路面的平整度有一定的指导作用。
2.
According to the specifications on high-grade asphalt concrete pavement related quality control measures are proposed from five aspects such as mating of construction mechanism, mixing of bituminous mixtures, mechanized construction management and so on in order to ensure the pavement quality.
针对高等级沥青混凝土路面的技术要求 ,从机械配套、沥青混合料的拌和、摊铺、碾压、机械施工组织管理等五个环节提出了质量控制方法 ,以保证所铺设路面的高质量。
5)  construction equipment
施工机械
6)  construction plan
施工计划
1.
This paper points out that before the construction of the coking oven,should compile the detailed and strict construction plan and construction period,and should implement the norms of the construction of the coking oven strictly,and puts forward some detailed methods for solving the problems frequently occurring in the construction of the coking ovens.
提出了砌筑焦炉前首先应编制详尽严谨的施工计划与工期,砌筑中严格筑炉规范。
2.
It is not until the beginning of actual construction that the construction planner can realize the validity of his construction operations planning.
工程施工计划是一项复杂的工作,不断增长的复杂因素决定了工程管理人员需要采取新的、从未被用过、检测过的工程施工方法。
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条