说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 损伤进行区
1)  damaging zone
损伤进行区
1.
Based on CT test of a certain sandstone under uniaxial compression,the safety zone,the damaging zone and the fracture zone of the sandstone are defined.
在砂岩单轴压缩CT试验的基础上,定义了岩土材料的安全区、损伤进行区和破损区,对分区的CT阈值标准进行了讨论和经验选定。
2)  slowly progressive brain damage
慢性进行性脑损伤
3)  progressive compression spinal cord ischemic injury
脊髓进行性压迫性损伤
4)  progressive damage
渐进损伤
1.
HHT-based structural progressive damage of multi-degree freedom
基于HHT的多自由度结构渐进损伤特征提取方法
5)  damage zone
损伤区
1.
Based on the change rate of sound wave speed before and after blasting,damage zone size of surrounding rock has been determined.
结论认为,在柱状装药情况下,岩体损伤范围随装药量的增大而增大;爆炸荷载作用下的岩体损伤区深度小于损伤区半径,二者比例约为1∶3。
2.
The damage zone development and damage evolution ahead of a crack tip in an dutile metal specimen are studied from the viewpoint of continuum damage mechanics.
从连续介质损伤力学的基本理论出发 ,研究了金属试件中裂纹尖端损伤区的发展和区内损伤的演变 。
6)  injury interval
损伤区间
补充资料:为什么在城市规划区内进行改变地形地貌的活动必须经过批准

在城市建设发展过程中,一些建设工程需要大量的填工、弃土,建材生产需要大量的挖取砂石、土方,并且城市经常有大量的房碴土,工业废碴,生活垃圾等需要堆弃,也有的是进行营利性质的挖取砂石、土方的活动。这些改变地形地貌的活动在城市规划区内进行,必须要破坏城市地形地貌,甚至破坏河道、防洪道、园林绿化、文物古迹市政工程设施,地下管线设施以及人防设施,影响城市环境和安全以及城市居民的生产与生活,影响城市规划的顺利实施。为了保护城市环境,避免超成经济损失,城市,规划区凡是改变地形地貌的活动必须按照城市规划进行管理。《城市规划法》第三十六条规定。“在城市规划区内进行挖取砂石、土地等活动,必须经有关部门批准,不得破坏城市环境,影响城市规划的实施”。这就要求,任何单位或者个人进行改变地地形地貌的活动必须经符合城市规划要求,按照,规划管理的有关规定办理,经过批准后,方能进行。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条