1) construction coordination
施工协调
1.
Discussion on construction coordination of general contracting unit;
浅谈总包单位的施工协调
2) harmonious actualization
协调实施
1.
In the end, the article probes into the harmonious actualization combined with ISO 9001 and CMM at organizations which regard software development as their main operation.
通过分析ISO 9001:2000与CMM的相互关系,论述了二者之间的相关性和互补性,并对二者有机结合的理论基础进行了阐述,最后对ISO 9001和CMM在以软件开发为主要业务的组织中的协调实施进行了探讨。
3) Infrastructure Coordination
设施协调
1.
Study on Infrastructure Coordination of Urban Rail Transfer Stations;
城市轨道交通换乘站设施协调研究
4) coordinating measure
协调措施
1.
Startingfrom the self-adapting of the athletes and based on the result of interviews and the questionnaires,we design professional counseling forms and use Delphi Model to analyze the main factors which will affect the relationship between the athletes and athletes and thus work out the corresponding coordinating measures.
从运动员的自身调整角度入手,以对运动员的访谈和问卷调查的结果为依据,分析影响运动员之间人际关系的主要因素,并提出相应的协调措施。
2.
Starting from the self-adapting of the coaches and based on the result of interviews and the questionnaires, we design professional counseling forms and use Delphi Model to analyze the main factors which will affect the relationship between the coaches and athletes and thus work out the corresponding coordinating measures.
本文以水上运动项目为例研究优秀运动队中的教练员与运动员人际关系,从教练员的自身调整角度入手,以对教练员和运动员的访谈和问卷调查结果为依据,设计专家咨询表,采用特尔菲法分析出影响教练员与运动员人际关系的主要因素,并提出相应的协调措施。
5) construction investigation
施工调查
1.
The paper points out that the construction investigation and drawing paper examination and verification can obtain good construction effect, advance limit time and save investment cost.
结合工程实例 ,通过施工调查和图纸会审对工程原设计进行了修改 ,并介绍了修改设计后的施工情况 ,不仅提前了工期 ,还节省了投资 ,表明切实做好施工调查和图纸会审对工程顺利开展及实现设计完善与优化的重要性。
6) air-conditioning construction
空调施工
1.
On some suggestions for precautions in ventilation and air-conditioning construction
通风与空调施工中应注意的几点建议
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条