说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 合龙口
1)  final closure
合龙口
1.
When the method of mud displacement by blasting is used to improve a foundation,treatment of the final closure is always the key and difficult point for quality control.
采用爆破挤淤法进行基础处理时,合龙口一直是质量控制的重点和难点。
2.
The paper analyzes the causes for the collapse of the final closure of a spoil dyke project and determines the safety factor of the collapse section by computation.
文章对某围埝工程合龙口塌陷的原因进行了分析,并通过计算确定了塌陷断面的安全系数;根据土体十字板强度,提出了塌陷断面的修复方案。
2)  dike closure
龙口合龙
1.
The construction difficulty of dike closure would be increased when multi-basin rivers are converged on the reclamation project area.
多流域水系在围垦工程围区内汇合,增加了围垦工程龙口合龙施工的难度。
3)  gap closure
堵口合龙
4)  Longkou
龙口
1.
Application of "harmonized team" concept in project supervision of Longkou;
“和谐大团队”理念在龙口工程监理工作中的体现
2.
The analysis of urban expansion of Longkou cityon the basis of remote sensing techonology;
基于遥感技术的龙口市城市空间扩展分析
3.
Winter Food Habits of Gorals in Longkou Nature Reserve of Heilongjiang Province;
黑龙江龙口自然保护区斑羚冬季食性分析
5)  river kerf
龙口
1.
In this model, empirical curve method isadopted for opened diversion channel, and broad crest weir theory is adopted for the river kerf.
介绍了三峡工程大江截流的特点及开展本项研究的必要性,建立了导流明渠采用经验曲线法、龙口应用宽顶堰理论~[1]的三峡工程截流期水力学要素预报模型。
2.
The river kerf is simulated to trapezoidal or triangular section according to its width and the broad crest weir theory is used to formulate hydraulic elements calculating model in the period of the Changjiang river closure of the Three Gorges Project.
介绍了三峡工程大江截流的特点;根据龙口宽度的大小将其处理为梯形或三角形断面,并分别应用宽顶堰理论,建立了大江截流期龙口水力学要素计算模
6)  closure gap
龙口
1.
Influence of downstream water depth of closure gap on river closure difficulty;
龙口下游水深对截流难度的影响
2.
Study and practice of technologies for protection and closure of extra-large closure gap of tidal estuary
潮汐河口上超大龙口保护与截流工艺及结构研究与实践
3.
According to the practice project of the Qingcaosha reservoir in the Yangtze estuary,the vertical 2Dflows with the free surface at the closure gap are computed using CFD method.
以长江口青草沙水库主龙口施工过程为背景,在恒定来流及出水口入水口水位差给定的情况下,应用基于 RANS 方程和 VOF 方法的 CFD 技术对龙口垂向二维水流流态进行了数值模拟。
补充资料:合龙


合龙
breach blocking

水流仍可通过,待全部沉厢就位后,在一次合适的平潮期,同时放下闸门,完成合龙。(徐福龄)称为合龙桩。将合龙大缆拉过龙门口,结活扣于两金门占的合龙桩上(图l、。然后用麻绳编结成网称为龙衣。网眼0.15一0.2米见方,网的长宽尺度应与龙门口大致相等,网结成后,用木杆或大竹竿做心,将龙衣卷成捆,并把龙衣的引绳头牵过对岸,这时数人横躺在龙衣上,推卷前进,同时用小绳将龙衣与合龙缆扎紧,随滚随扎,直到对岸。龙衣铺成后,即推放一层秸料,以能上人走动为宜,愈向中间,因为人与料的重量下压,使绳伸长垂成弧形,然后上五花骑马桩,压土袋,如此层层相压,做到一定高度,在两金门占统一指挥同时松绳沉绿入水,并继续加料上土,上五花骑马桩直至压绿到底,把口门堵塞合龙。在用双坝进堵时,应使正坝合龙后,再进行边坝合龙,在水大流急的情况下,用合龙绿合龙,往往由于松绳不匀,会发生卡埔或扭绿现象,如塌压不到底,绿底下流速加大,冲刷河底,如金门占发生蛰动,有功败垂成的危险。i扣一洲亦可采用竹笼装石或铅丝笼装石成枕,按上法进行投.这种枕易于下沉入水。抛枕合龙主要优点是施简单,进堵迅速,比较稳妥,缺点是枕与枕间的空大,漏水较严重,在用双坝合龙时,一般正坝用抛合龙,边坝用合龙缔合龙,以利闭气。 1956年中国江苏省射阳县新洋港截流工程,因汐吞吐量大,口门缩小,河底不断冲深。在进堵归口门先用柴石枕护底,在夏船上施工,夏船一般用组双拼或双组对尾双拼两种组合,施工时在岸上观视距。控制夏船位置,均由河心分向两岸移船倒主利用低水潮时,双组夏船的前船掀第一路柴石枕;船掀第三路柴石枕,抛完后再移船分别补抛二、四路,单组夏船则按控制线依次抛枕,互相紧密衔接(图3),为避免重迭漏空现象,当护底后,趁平潮f用船装石,普遍抛大块石一层,填补柴石枕空隙.期平整,然后用捆厢蹄进占,口门缩窄至107米日抛工隙枕潮么单测虱后两见么以卜 抛枕合龙当口门缩窄,用合龙绿不易堵合时,龙门口可适当放宽至30一60米,进行抛枕合龙,有护底抗冲的作用,捆柳柴石枕的方法,一为散柳柴包石(或淤泥)捆枕;二为柳柴把包石捆枕(见图2)。枕中放置龙筋绳,枕的直径0.8一l米,长10一20米。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条