1) rock covering thickness
岩石覆盖层厚度
1.
Combined with subsea tunnel engineering at eastern route way in Xiamen,the minimum rock covering thickness of subsea tunnel,water pressure design values,section optimization of lining structure and waterproof and drainage project,construction measures throughout bad subsea geology section,such as fault,solution groove,necessity of service tunnel setting were analyzed.
结合厦门东通道海底隧道工程,对海底隧道最小岩石覆盖层厚度、水压力设计值的确定,衬砌结构断面优化与防排水方案,穿越海底不良地质段(断层、溶槽)的施工措施及服务隧道设置的必要性问题进行了分析。
2) minimum overlying rock thickness
最小岩石覆盖层厚度
1.
Study on the minimum overlying rock thickness of a crossing-river tunnel by borehole-blasting method;
越江隧道钻爆法施工最小岩石覆盖层厚度研究
3) thick rock overburden
厚覆盖岩层
1.
The analysis of 3D elasto-plastic FEM is introduced for calculating the deformation of the ground surface caused by underground mining under thick rock overburden.
介绍了在厚覆盖岩层条件下,确定地下采矿引起地表变形特征的三维有限元弹塑性计算分析工作。
4) minimum rock cover
最小岩石覆盖厚度
1.
Displacement convergence method for minimum rock cover above submarine tunnel;
海底隧道最小岩石覆盖厚度的位移收敛法
2.
Study on numerical method for the minimum rock covers of subsea tunnels;
数值方法确定海底隧道最小岩石覆盖厚度研究
3.
At present,many subsea tunnels are under construction or design in China,and the minimum rock cover is one of main issues in subsea tunnel vertical cross-section lining design;and the subsea tunnel cost and safety are directly governed by the minimum rock cover.
目前国内正在修建或拟修建多条海底隧道,其最小岩石覆盖厚度是海底隧道纵断面线路设计的主要参数之一,将直接制约着海底隧道的安全和工程造价。
5) cover thickness
覆盖层厚度
1.
The determination of the cover thickness of the submarine tunnel is very important,because it will be very dangerous if the cover thickness is too small,whereas the length,slope gradient and cost will be increased after a larger cover thickness is chosen.
江底隧道的覆盖层厚度十分重要。
2.
In underwater tunnel construction,the cover thickness not only plays the decisive role in its security,but al- so is a leading factor determining the underwater tunnel s cost and length.
在水下隧道施工中,覆盖层厚度不仅对其安全性起着决定性作用,而且还是决定水下隧道造价和长度的主要因素。
3.
In underwater tunnel construction,to confirm the reasonable cover thickness is the key in the technology.
合理的确定水下隧道覆盖层厚度是建设水下隧道关键技术之一。
6) Overburden thickness
覆盖层厚度
1.
The method can determine the overburden thickness based upon the electricity difference between overburden and lower datum rock, and is one of the most valid method with high-efficiency, depth and accuracy for ground electricity section imaging in hydrogeology and engineering geology.
这里简要阐述了高密度电阻率法发展过程、勘探原理、野外工作方法,并将该方法应用到水电站选址覆盖层厚度探测中,获得了测区部位的视电阻率二维成像图。
2.
12 construction schemes are constituted according to the space temporal relationship between construction steps,the excavating method,the length of drivage cycle,the space distance among each working face and the overburden thickness of each tunnel.
根据各条隧道开挖支护施工步的空间时间关系、工作面开挖方法、掘进进尺、各掌子面空间间距和覆盖层厚度等多种因素制定12种施工方案并用FLAC3D进行相应的三维数值计算。
补充资料:崩落岩石覆盖下放矿
崩落岩石覆盖下放矿
ore drawing under caved rock
从放矿点放出1个单兀就留下l个空位,在这个空位上面的9个单元中的1个单元随机地移动到这个空位 中,然后这种随机移动过程一直传递到最上面一层崩落岩石单元.该层的空位则由新崩落下来的岩石单元来补偿。使9个单元中的1个随机地移动到空位中的方法是,先使9个单兀各具有1个移动概率,并使这9个移动概率在(、一1间各占据1个区间,然后用公式算出1个伪随机数,再看该伪随机数处于哪个移动概率区间内,最后使占据该移动概率区间的单元移动到空位中。9个单元所取的移动概率,应使根据这种理论模拟出的放出体形状与物理模拟出的放出体形状尽量接近。各次算出的伪随机数在。一1间均匀分布,能使本应具有相同移动量的各个单元在都经过多次移动后具有相同的移动量。在这种理论中,每个单元的每次移动是随机的(但是这是出于简化模拟方法的需要,并不是对客观实际中的崩落矿岩移动的随机性的模拟),因此根据这种理论进行的数学模拟放矿是随机性数学模拟放矿由于进行这种模拟放矿时随机移动的次数非常多,所以模拟出的结果基本是确定性的。 使用移动概率场的崩落矿岩随机移动理论的主要内容是,将空位上面9个单元的移动概率作为基本移动概率,而且使中央单元、四帮单元和四角单元的移动概率分另。等于壳、是和六,然后按第1层中每个单元的被当作空位的概率等于这个单元的移动概率的原理去求第2层中各单元的移动概率;对于有可能向第1层中儿个空位中移动的第2层中的单元,将这个单元向几个空位中移动的概率加在一起作为这个单元的移动概率(见图)。对于上面各层的各个单元的移动概率也这样求,最后得出一个含离散坐标的移动概率场,用数学归纳法得出表示该移动概率场的方程,再用概率论中的极限定理将含离散变量(坐标)的移动概率场方程变成含连续变量(坐标)的移动概率场方程(这个方程与正态概率密度函数相同),通过放矿实验和回归分析增加一些系数将方程改写,以反映崩落矿岩移动条件改写过的方程中的移动概率的含义如下: 当一次从放矿点在一瞬间放出体积为(lm)3的一个单元时,填补这个lm3空位引起的每个水平层中一些体积为(lm)3的单元的一瞬间垂直下向移动量的和也是飞m3,每个单元的这种移动量在数值上就等于其移动概率(因为这些移动概率的和也是1)。 (3)崩落矿岩动力学理论该理论包括离散化的和连续化的两种理论。旨在阐述放出体理论、随机移动理论所未涉及的动力学问题。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条