说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 验收强度
1)  check and accept intensity
验收强度
1.
Based on the assumption that the overall intensity of concrete has been distributed in normal state,the inequality equation group shows the relationship among confected intensity,the sample test and the check and accept intensity of concrete.
假定混凝土总体强度呈正态分布,通过概率统计基本知识和抽样检验理论建立了混凝土施工配制强度与抽样检验方案及混凝土验收强度之间关系的不等式方程组,由此找到了一种确定混凝土配制强度的更合理的方法。
2)  concrete strength acceptance
混凝土强度验收
3)  Standard deviation of strength of inspected lot
验收批强度标准差
4)  shrinking intensity
收缩强度
1.
By taking the weight of mean-variance model as the sample information and taking the weight of market portfolio as the non-sample information,the shrinking intensity of investment weight was studied by Stein rule.
根据斯坦规则原理 ,以均值—方差模型投资权重为样本信息 ,以市场证券组合的投资权重为非样本信息 ,研究了如何确定投资权重收缩估计量的最优收缩强度 ,实现了投资组合主动管理与被动管理的有机结合。
5)  absorption intensity
吸收强度
6)  Strength test
强度实验
1.
The reliability of the 3_D finite element method is verified by comparing the data obtained from strength test with the ca.
用强度实验获得的数据和有限元法获得的计算结果作比较 ,从而验证三维有限元法的可靠性 ,并获得了一些关于这种复杂结构形式的桅杆强度的有意义的研究成果 ,可供隐身桅杆的设计提供参考 。
补充资料:承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利
承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利:根据我国《合同法》的第278条规定隐蔽工程在隐蔽以前,承包人应当通知发包人检查。发包人没有及时检查的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。根据《合同法》第279条中的规定建设工程竣工后,发包人应当根据施工图纸及说明书、国家颁发的施工验收规范和质量检验标准及时进行验收,因此在工程完成时组织竣工验收,也是发包人的主要义务。建设工程竣工验收合格后,方可交付使用,未经验收或者验收不合格的,不得交付使用,发包人对未经验收的工程,提前使用或者擅自动用的,对发现的质量问题由发包人自行承担责任。-------------《民法》第一版,第514页。魏振瀛;《合同法》的第278条
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条