1) install that familiar equipments and cable
常见设备及线缆的安装
1.
The paper expatiates to the basic request that the GCS of construct and its kind of factor of the consideration,discusses various of preparation in construct and install that familiar equipments and cable,inquiries some matters concerned in process of construct.
文中阐述了综合布线系统工程施工的基本要求及其应综合考虑的各种因素,论述了施工前的多方面准备和常见设备及线缆的安装,探讨了施工过程中常见的注意事项。
2) PACE(program for arrangement of cables and equipment)
电缆及设备安装程序
3) equipment & installation
设备及安装
1.
It is tried to find the answer by investigating the process,the method,the equipment & installation,the design and the manufacturing tolerance.
上海汽轮机有限公司引进型 30 0MW汽轮机低压转子多次出现需要现场动平衡现象 ,本文针对这一问题从高速动平衡工艺 ,动平衡方案 ,动平衡设备及安装 ,转子设计及制造误差等方面研究并寻找答案 ,发现并解决了其中存在的部分关键问题 ,并就上海汽轮机有限公司高速动平衡仍然存在的问题提出建议。
6) cable installation
电缆安装、电缆敷设、电缆装置[设备]
补充资料:平炉设备安装
平炉设备安装
equipment erection of open- hearth furnace
大、小车限位应准确。上述试验应带冷料进行。 (曹德政)P ing{u shebei anzhuang平炉设备安装(equipment ereetion of open-hearth furnaee).平炉设备由炉头、炉膛、空气蓄热室、煤气蓄热室等部分组成。炉膛的前墙有3一5个装料炉门,后墙在炉底处有出钢口。平炉有固定式平炉和倾动式平炉之分。后者是将炉体固定在一个摇架上,通过操纵倾动机构而使炉体摆动。平炉本体为钢结构,内衬耐火材料。机械设备有倾动机构和辅助设备两部分。倾动机构的安装见混铁炉安装。平炉的辅助设备主要有:气体换向系统设备、补炉机械、炉门开闭机械、装料机械、炉下清渣设备、汽化冷却设备、吹氧设备和余热回收设备等。 气体换向系统设备安装气体换向系统设备有集中和分散两种配置型式,都是通过一个或几个换向阀,在各烟道交叉点或烟道中间分别控制气流,达到蓄热室格子砖加热及排除废气的目的(见图)。分散配置的换向系统,按工作要求采用水封钟罩式煤气阀、水冷钟罩式煤气废气阀、盘式空气阀及斜插板式空气废气阀,除了斜插板阀外,一般都由底盘(或水盘)、外壳、安全阀、钟罩、吊架、传动与导向装置等组成,并通过卷扬机及滑轮系统进行操作。寥 分散配置的换向系统 1、2一煤气阀;3、4一煤气凌气阀;5、6一空气阀;7、8一 空气废气阀.9一调节阀.10一烟道调节阉。11、12一废 气闸板;工、.、,一电动卷扬机;N一手动卷扬机换向系统设备安装在平炉炉前的钢结构平台最终固定后进行,首先安装底盘(或框架),然后装配钟罩、外壳、拉杆、卷扬机及滑轮系统。一般采用卷扬机及滑轮组吊装设备。安装中根据中心标板、基准点严格控制阀盘的水平度及阀杆的铅垂度。对于斜闸板,应控制其框架的倾斜角度。换向阀的通气、通水冷却部位,要进行强度试验和严密性试验。阀的提升装置及滑轮导向装置安装时,应控制在同一中心线上,防止钢绳啃卡滑轮及钟罩倾斜晃动。 换向系统设备试运转时,应先进行各阀的单体试运转,确认阀门运行灵活、无卡阻、无异常声响,限位控制准确。系统调试中应保证相对运动的两阀组动作协调,行程限位准确,并在保证水封不漏气的状态下,使其具有最小的气流阻力及最短的换向时间。 炉门开闭机械安装可利用炉台桥式起重机起吊设备,在炉体砌砖后进行。事先要进行通水冷却炉门和炉门框的强度试验和严密性试验。安装时应先安装炉门框,炉门安装配合耐火砖砌筑进行,并以炉门的实际安装中心确定炉门提升滑轮中心。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条