1) elastic-creep temperature stress
弹性徐变温度应力
3) creep thermal stress field
温度徐变应力场
1.
A whole process simulation calculation is done for the temperature field and creep thermal stress field of Baise RCC gravity dam from construction stage to operation stage under summer shutdown scheme by using 3D FEM relocating mesh method.
为了模拟碾压混凝土重力坝薄层施工过程 ,采用三维有限元浮动网格法对百色碾压混凝土重力坝夏季停工方案施工期至运行期的温度场、温度徐变应力场进行了全过程仿真计算 ,结果表明 ,只要合理确定坝段长度 ,即使不采用降温措施 ,夏季停工方案是能满足设计要求的。
4) thermal creep stress
温度徐变应力
1.
Concentrated on the questions in heightening of dams, and focused on the practice of heightening of Danjiangkou dam, questions in heightening of concrete gravity dams were systematically studied such as connection of new and old concrete, temperature field, and thermal creep stress field by using of large F.
本文围绕大坝加高中存在的问题,结合丹江口大坝加高工程,运用大型有限元计算软件ANSYS,从理论和实践上系统地研究了混凝土重力坝加高中的新老混凝土结合,温度场和温度徐变应力场等问题,主要内容如下:1。
2.
But temperature field and thermal creep stress of the roller comp.
但对使用混凝土面墙的碾压混凝土重力坝的温度场及温度徐变应力状况研究较少,因此本文的研究成果具有一定的应用价值。
5) creep stress
徐变应力
1.
hermal creep stresses in mass concrete structures are influenced by many random factors including the random temperature in the concrete.
大体积混凝土结构的徐变应力受多种随机因素的影响。
2.
Stochastic finite element method for random the rmal creep stress inmassive concrete structures is presented.
首次尝试将随机有限元法引入大体积混凝土结构随机温度徐变应力的计算。
3.
In creep stress analysis of concrete structures during construction period , the necessity to as-semble and decompose a large stiffness matrix for each time increment makes the computation verylengthy.
由于混凝土的弹性模量与龄期有关,计算混凝土结构施工期徐变应力时,必须将时间划分为一系列时段,在每一时段都要建立和分解刚度矩阵,计算量非常大。
补充资料:温度应力
分子式:
CAS号:
性质:当材料或构件的温度改变时,由于外部的约束和构件各部优发的相互约束,使构件各部分由于产生的膨胀或收缩不能自由地进行,由此产生的应力称为热应力,或称温度应力,也称变温应力。
CAS号:
性质:当材料或构件的温度改变时,由于外部的约束和构件各部优发的相互约束,使构件各部分由于产生的膨胀或收缩不能自由地进行,由此产生的应力称为热应力,或称温度应力,也称变温应力。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条