说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 冻结帷幕
1)  freezing curtain
冻结帷幕
1.
The tunnel with freezing method contraction by nonlinear computer software FLAC3D is analyzed,and the effects of step excavation,step pouring,underground continuous wall,pile foundation to deformation and stress of freezing curtain and lining,are analyzed.
采用大型非线性计算软件FLAC3D对于某冻结法施工的隧道进行了数值仿真模拟,综合考虑了分步开挖、分段浇注衬砌以及周围地下连续墙、桩基础对冻结帷幕和衬砌的变形与应力的影响,并进行了较深入的分析,得出了一些有意义的结论可供类似工程计算参考。
2.
By design and calculation,construction parameters of freezing curtain and freezing method are decided.
通过设计计算,确定了冻结帷幕施工参数及制冷参数。
2)  freezing waterproof curtain
冻结止水帷幕
3)  frozen soil wall
冻土帷幕
1.
In order to understand the artificial freezing technology employed in the deep pit,a physical model test of stress and deformation of large diameter round-shaped frozen soil wall was carried out on a self-developed large test rig.
利用自行设计加工的大型深基坑冻结模拟试验台,进行大直径圆形冻土帷幕受力与变形的物理模拟试验,获得深基坑开挖过程中圆形冻土帷幕水平位移随基坑开挖深度、开挖半径和冻土平均温度等影响因素的变化规律以及冻土帷幕暴露段水平变形规律。
2.
The influence of concrete hydration heat on the temperature of the frozen soil wall was analyzed by finite difference method.
利用有限差分方法,分析隧道联络通道结构施工时混凝土水化热对人工冻结形成的冻土帷幕的影响。
3.
"Chengbing" formula is widely applied in the calculation of the average temperature of frozen soil wall in artificial ground treezing.
"成冰"公式广泛应用于人工地层冻结法的冻土帷幕平均温度的计算,为了确定"成冰"公式的适应性,本文以基于巴霍尔金温度场理论的冻土帷幕平均温度计算方法为基础,考虑了影响人工冻土冻结温度的定量、定性因素,运用数学理论,分析了"成冰"公式在人工地层冻结中计算平均温度的适应性。
4)  multi-row-pipe frozen soil wall
多排管冻土帷幕
5)  curtain [英]['kɜ:tn]  [美]['kɝtṇ]
帷幕
1.
Effects of pH Value and Temperature on Adsorption of Heavy Metal lons by Anti-Seepage Curtain for Landfills;
温度和pH对填埋场防渗帷幕吸附重金属离子的影响
2.
Through curtain grouting, an effective and stable "flood control dam" is built which guarantee safty production of Zhangmatun iron deposit for 30 years.
济南张马屯铁矿安全生产30年,其根本保证是通过帷幕注浆建立起了一条长效稳定的地下“拦水大坝”。
3.
The general rule of fissure development in low dip soft-hard interbedding rock mass is described,and then based on this the dam foundation seepage is simulated with dual-medium model,and the influence of unstratabound fissure and waterproof curtain is discussed.
阐述了缓倾软硬互层状岩体中裂隙发育的一般规律,在这个基础上采用双重介质模型对层状坝基渗流进行了模拟,讨论了软岩层中切层裂隙的发育以及嵌入软岩帷幕对坝基渗流场的影响。
6)  drapery [英]['dreɪpəri]  [美]['drepərɪ]
帷幕
1.
It introduces application of deep mixing cement-soil pile in maintenance of foundation pit, combined with storing pool of coking equipment it discusses no-support and earth-retaining & water-retaining drapery and its effect, which to extend the method.
介绍了深层搅拌水泥土桩在基坑维护中的应用,以某焦化装置内贮焦池具体工程为例,探讨了这种坑内无支撑、挡土挡水型帷幕的做法及应用效果,以推广应用该方法。
补充资料:帷幕


帷幕
curtain

WelmU帷幕(curtain)沿坝基及其两岸延伸部分的地下连续防渗幕体.它是常用的坝基防渗措施之一帷幕与挡水建筑物的防渗结构的可靠连接,共同形成地上、地下连续的防渗体系.用钻孔灌水泥浆或各种化学浆液形成的帷幕称灌浆帷幕(见帷幕灌策和化学灌泉).在砂砾石坝基中用泥投土防渗堵形成的帷幕称垂直防渗J.帷幕(见软基处理)。在防渗墙下进行灌浆的帷幕称组合式帷幕。帷幕的作用主要有:①减少坝基和绕坝渗漏量。②防止断层裂隙中的充填物及抗水性能差的岩层产生管涌。③在帷幕和排水的共同作用下,使幕后坝基及两岸边岸的渗透压力降低至允许值,防止渗透压力对坝体、坝基及两岸边坡稳定产生不利影响。④灌浆帷幕兼有对坝基表层的接触灌装和固结灌泉的作用。 帷幕的深度和伸人两岸的范围由坝高、地质条件及防渗要求等确定。帷幕深度一般伸人相对隔水层以下3~sm;伸人两岸的范围一般至正常蓄水位与天然地下水位相接处。帷幕范围也可根据地质条件及防渗要求,经计算或试验确定.通常帷幕深度多为0.3一。.7倍水头.相对隔水层考虑坝高、坝型、地质条件等因素,以钻孔压水试验透水率q<1~10 Lu(吕荣)为标准。岩溶地区的帷幕深度及伸入两岸的范围,应根据岩溶及渗漏通道的分布情况和防渗要求确定。伸人相对隔水层的帷幕称封闭式帷幕。未伸人相对隔水层的帷幕称悬挂式帷幕. 帷幕灌浆的钻孔方向有垂直的和倾斜的。帷幕钻孔的排数有单排的和多排的.倾斜帷幕在一定地质条件下,能穿过较多的岩体裂膝和层面,有时比垂直帷幕的防渗效果好,但对钻孔施工要求较高。单排孔帷幕适用于岩体完整性良好透水性弱的坝基;当帷幕承受水头较高或裂隙发育、岩体透水性强时,可采用多排孔帷幕。 当水头较高时,为保证帷幕质量和方便施工,两岸帷幕沿坝基按30~50m高差分层布置和施工,上、下层帷幕搭接处采取浅孔灌浆等措施以保证其可靠衔接。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条